Construction Technology for Ultra-wide Excavation near Existing Buildings in Metro Station Shield Tunneling Receiving Area

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8

Abstract

Objective It is aimed to address the difficulty in settlement control of existing ground buildings during ultra-large section excavation beneath them in metro station construction. Method Based on the shield tunneling receiving area project of newly built Chengdu Metro Line 18 Nijiaqiao Station, which passes under an existing overpass approach bridge, numerical simulation analysis is conducted to study the construction technology of ultra-wide expansion excavation near existing buildings, and field monitoring data is used for verification. Result & Conclusion The use of advanced pipe-roofing, 12-pilot tunnel segmented expansion excavation, and composite lining construction techniques can effectively control the settlement of existing buildings while enabling long-distance expansion of the main station structure and ensuring the hoisting clearance for shield machine reception. The primary construction steps affecting the settlement deformation of existing buildings are the removal of protective piles and the excavation of ① and ⑦ pilot tunnels. Significant settlement is observed at ① and ④ pilot tunnels, with the maximum settlement value reaching 8.82 mm, which is 1.21 times the maximum settlement value obtained from the simulation. Both the measured and simulated results meet the safety control requirements.

Authors and Affiliations

Wu PAN

Keywords

Related Articles

Research on the Impact of Metro Station Illuminance on Passengers′ Emotion and Visual Cognition

Objective Proper illuminance environment plays an important role in improving the service level of metro stations, ensuring the safety of passenger evacuation and promoting the sustainable development of public transport...

Study on Flow Plasticity and Permeability of Mixture Conditioned Muck for Metro Shield Tunnel in Water-rich Sand Stratum

[Objective] When tunnel boring machine advancing in the water-rich sand layer, problems such as high cutter torque, serious wear and spout of the screw conveyer can be easily generated. In order to ensure the safety of c...

Disturbance Action of First Excavation on Reinforcement Effect of Later Excavation in layered Tunnels

Objective In the ultra-close layered tunnel construction, the preceding excavated tunnel can cause unpredictable damage to the surrounding rock, which will affect the smooth construction of the following tunnel and incre...

Design and Realization of Urban Rail Transit AFC Intelligent Operation and Maintenance System Architecture Driven by Dual-core of Data and Model

Objective The traditional urban rail transit AFC (automatic fare collection) system suffers from maintenance problems such as slow speed, outdated method, unreasonable plan and high cost. It is necessary to adopt digital...

Analysis of Bearing-settlement Characteristics of Extra-long Bored Piles in URT Deep Soft Stratum Underground Station

Objective To effectively control the deformation of station structure during the excavation and usage of deep foundation pit in soft soil stratum, and to increase the bearing capacity of foundation pit bottom, it is nece...

Download PDF file
  • EP ID EP742697
  • DOI 10.16037/j.1007-869x.2024.08.026
  • Views 15
  • Downloads 0

How To Cite

Wu PAN (2024). Construction Technology for Ultra-wide Excavation near Existing Buildings in Metro Station Shield Tunneling Receiving Area. Urban Mass Transit, 27(8), -. https://europub.co.uk/articles/-A-742697