Contractual Steps for Smooth Delivery of Infrastructure Projects

Abstract

Governments and public entities spend huge public money for purchase of goods, services and construction of works. Therefore, it is vital that procurement system shall not only be efficient but also be transparent, fair & just without compromising the quality of output. Various stakeholders have different interests in influencing the decision-making. This paper elaborates various possible alternative strategies available for procurement. Depending upon environment and various challenges, one can choose the best mode, method & process of procurement. The procurement could be for goods, work, services, consultancy etc. Consultancy contracts are different game altogether, because they have more emphasis on intellectual inputs rather than mere physical outcome. The scope of this paper is limited to works procurement.

Authors and Affiliations

Keywords

Related Articles

Fault Analysis Using Superconducting Fault Current Limiters

Smart grid is an advancement of the existing electrical grid. The key feature of the future smart grid is the decentralization of the main power grid into number of smaller grids (known as micro grids). Interconnection o...

Review Paper on Smart Sensor Network for Air Quality Monitoring

Green and clean environment across the globe is very much essential for the health of the nature. Unfortunately different kinds of pollution are affecting the quality of the environment around us. This review paper is ma...

GEOPOLYMER AS REPAIR MATERIAL - A REVIEW

Cement is the world's most used construction binder material. Cement production emits large amounts of CO2 and consumes significant amount of energy. As a result, it is necessary to find a new concrete material to replac...

Fully Automated Electronic Mock Examination in an Introductory Computer Science Course

A mock examination is an exam that does not count for credit. It is taken before an official examination and gives students the opportunity to practice for the later, important exam. The mock examination provides student...

SEDIMENT QUALITY ASSESSMENT OF AVARAGERE LAKE, DAVANAGERE CITY - A CASE STUDY

Avaragere Lake in Davangere was studied for chemical and physical parameters at five locations, for a period of six months (April 2014 to Sep 2014). Lake has been subjected to human interferences regularly and water qual...

Download PDF file
  • EP ID EP175644
  • DOI -
  • Views 239
  • Downloads 0

How To Cite

(2016). Contractual Steps for Smooth Delivery of Infrastructure Projects. International Journal of Innovative Research in Advanced Engineering, 0(0), 11-21. https://europub.co.uk/articles/-A-175644