Corrigendum to ”Neighbourhood Properties in Some Single Processor Scheduling Problem with Variable Efficiency and Additional Resources”

Journal Title: Decision Making in Manufacturing and Services - Year 2014, Vol 8, Issue 1

Abstract

Amendment to [Decision Making in Manufacturing and Services, vol. 5 (1–2), 2011, pp. 5–17

Authors and Affiliations

Mateusz Gorczyca, Adam Janiak, Władysław Janiak

Keywords

Related Articles

Very Fast Non-Dominated Sorting

New and very ecient parallel algorithm for the Fast Non-dominated Sorting of Pareto fronts is proposed. By decreasing its computational complexity, the application of the proposed method allows us to increase the speedup...

Developing and Deploying Electronics Assembly Line Optimization Tools: A Motorola Case Study

The assignment of workloads to production equipment is one category of planning decision for an electronics assembly factory. In practice, line balancing requires not only selecting machines with sufficient placement acc...

CP-driven Production Process Planning in Multiproject Environment

The way enterprise capabilities are used decides about its competitiveness among other ones. In that context modeling aimed at production tasks allocation planning plays a crucial role especially at concurrently executed...

Guest editorial

We are glad to see the final version of this special issue of Decision Making in Manufacturing and Services (DMMS) on Optimization in Supply Chain Management take shape. It does not come as a surprise that we received a...

Mixed Integer Programming Approaches to Planning and Scheduling in Electronics Supply Chains

This paper discusses mixed integer programming (MIP) approaches to planning and scheduling in electronics supply chains. First, the short-term detailed scheduling of wafer fabrication in semiconductor manufacturing and d...

Download PDF file
  • EP ID EP165391
  • DOI 10.7494/dmms.2014.8.1.39
  • Views 85
  • Downloads 0

How To Cite

Mateusz Gorczyca, Adam Janiak, Władysław Janiak (2014). Corrigendum to ”Neighbourhood Properties in Some Single Processor Scheduling Problem with Variable Efficiency and Additional Resources”. Decision Making in Manufacturing and Services, 8(1), 39-39. https://europub.co.uk/articles/-A-165391