Delay Study in the Construction Project: An Overview

Abstract

“Scheduling” is the word when it came in our mind it means the time table and most important thing is that, works should be done in time, but even if we try everything to keep our time table in schedule some of the factors that cause us late by increasing our time, they are called “DELAY FACTOR” and the time increase by them, known as “DELAY”. DELAY is the factor which is responsible for every other factors which cause lose of time, money etc. especially the most prominent loss of time and money causes by delay factors is in construction. Today construction growth in the world is increasing day by day. In every part of the world an ongoing construction can be seen, so it is very important to keep every construction on time, but quite often it is not possible because many sub-factors from different main factors cause delay and keep the construction behind the time in comparison of schedule time. The main focus of this paper is to determine the current and most responsible Delay factors by methods of MCDM and by arranging and listing them, with the recommendation to minimizing them.

Authors and Affiliations

Shubham Sharma, Mukesh Pandey, Sohit Agrawal

Keywords

Related Articles

Area Optimized Radix-2 8-Bit Reversible Booth Multiplier

Reversible logic attains the attraction of researchers in the last decade mainly due to low-power dissipation and area efficient. Designers „endeavours are thus continuing in creating complete reversible circuits consist...

Overall Analysis of Groundwater Samples for Drinking Quality in Eight Districts of the Malwa Region of Punjab

This paper presents the groundwater quality of Malwa region of Punjab. 240 Villages from the eight districts were selected for the study and compared. The parameters studied were PH, total alkalinity, total hardness, tur...

Determination of Optimum Quantity Cost and Cycle Time Using Inventory Model with Stock Level Dependent Demand Rate and Variable Holding Cost. (A Case Study of Mantrac Ghana Limited).

An inventory represents one of the most important assets that most businesses possess. The turnover of an inventory represents one of the primary sources of revenue generation and subsequent earnings for the company's sh...

Single-Hole Charging in Self-Assembled Silicon Nanostructures

Firstly, we present ultra-shallow (5-30 nm) diffusion profiles performed by short-time boron diffusion from the gas phase into the n-type Si(100) wafer using controlled surface injection of self-interstitials and vacanci...

Probabilistic Seismic Hazard Assessment at Maheshwar Hydel Project Dam Site

Maheshwar Hydrolectric Project is constructed across the river Narmada in the downstream of famous Narmada Sagar multipurpose project in the state of Madhya Pradesh (India). In this study seismic hazard has been assessed...

Download PDF file
  • EP ID EP391527
  • DOI 10.9790/9622-0707012123.
  • Views 121
  • Downloads 0

How To Cite

Shubham Sharma, Mukesh Pandey, Sohit Agrawal (2017). Delay Study in the Construction Project: An Overview. International Journal of engineering Research and Applications, 7(7), 21-23. https://europub.co.uk/articles/-A-391527