Determinants of risk assessment process in critical energy infrastructure

Journal Title: Współczesna Gospodarka - Year 2016, Vol 7, Issue 2

Abstract

Article deals with the problem of risk assessment in critical energy infrastructure. Firstly the critical infrastructure in energy sector is discussed than risk identification methodology for application to critical infrastructure is proposed. Specific conditions resulting from features of critical infrastructure are addressed in the context of risk assessment procedure. The limits of such a procedure are outlined and critical factors influencing different stages of risk assessment process are researched in view of specificity of the sector.

Authors and Affiliations

Przemysław Borkowski

Keywords

Related Articles

Problems of sustainable social and economic development of Ukraine

The article presents the results of a systematic consideration of the complex issues of sustainable development of the national maritime transport subsystems in the global maritime transport industry. Particular attentio...

Architecture of European System of Financial Supervision after the global economic crisis

This paper indicates how the last global financial crisis has affected the european financial system. As the depression evolved it brought all the weaknesses in the system of financial supervision to the surface. Then it...

Identyfikacja zjawiska niedoszacowania debiutujących akcji i ich przeszacowania w dłuższym okresie na giełdzie warszawskiej w latach 2005-2013 

Z teorii rynków efektywnych wynika, że nie jest możliwe systematyczne osiąganie ponadprzeciętnych stóp zwrotu z inwestycji na rynku kapitałowym. W praktyce występują jednak różnorodne rynkowe anomalie podważające to twie...

Neural methods for the financial prediction

Artificial neural networks can be used to predict share investment on the stock market, assess the reliability of credit client or predicting banking crises. Moreover, this paper discusses the principles of cooperation n...

The roots of macroprudential policy and the risk-taking channel of monetary policy

Purpose: the main objective of this manuscript is to confirm that since there is a direct link between macroprudential policies and monetary policy, it is worthwhile to analyze the inter-dependence with the risk-taking c...

Download PDF file
  • EP ID EP143971
  • DOI -
  • Views 52
  • Downloads 0

How To Cite

Przemysław Borkowski (2016). Determinants of risk assessment process in critical energy infrastructure. Współczesna Gospodarka, 7(2), 53-69. https://europub.co.uk/articles/-A-143971