Determination of rational conditions of application of rock layered milling combines on iron ore pits

Abstract

The method of determining the effective use of milling type surface miners for the use of non-blasting technology of layer milling of rocks during open exploration of iron ore deposits has been improved. The non-blasting technology is unconventional, but in the presence of optimal technological parameters of surface miners it is possible to reduce the cost of extraction of iron ore raw materials. In the work, the methods of theoretical and experimental research of the work of layer-by-layer milling combines are used. The methods take into account the results of operation of this high-performance excavation-loading equipment in domestic and foreign scientific works. The presented method increases the efficiency of the use of combines layer-by-layer milling in complex geological and mining conditions of open pit mining, reduces the cost of mining due to the lack of drilling and blasting. Optimization of parameters of elements of system of mining is carried out, allows the milling combine carries out mining of the massif of rocks with an opportunity to fulfill a ledge of much bigger height in comparison with a traditional way of mining of the massif, and also at safe and much smaller width of a working platform of a ledge. That allows you to improve the technical and economic performance of the open pit by increasing the angles of slopes of the sides of the pit. The use of technology of layer-by-layer milling of rocks by surface miners significantly reduces the negative impact on the environment, increases the efficiency of mining. Moreover, milling combines carry out testing of the rock massif of the ledge with the already specified parameters of the elements of the mining system of the current technology of open pit mining in compliance with all technological standards.

Authors and Affiliations

O. Vusyk, A. Pyzhyk

Keywords

Related Articles

Scientific and practical problems of reflection of land resources in accounting

The implementation of the land market in Ukraine actualizes the problems of accounting of land resources from viewpoints of generation of accurate and trustworthy information about quantitative, qualitative, and cost ind...

The formation of separation cracks in the extraction of block stone

Currently, the undisputed leader of the destruction of strong rocks by mining as open-pit and underground mining is drilling and blasting method. The main disadvantage of this method is the seismic effect of the explosio...

Development of phase shifter for control of linear and circular polarized television signals

The article is devoted to the development of radio frequency MEMS phase shifters, the study of their characteristics and values in the field of wireless communication, as well as various types of analysis for checking th...

Advanced adaptive two-cutter boring head

The design of advanced adaptive boring heads with automatic metal-cutting elements is developed. It allows setting up the heads for the finishing of inner cylindrical surface with the required accuracy, depending on the...

Research of dependence of electrodynamic characteristics of the crack which have been cut in the rectangular wave guide, from change of its sizes and position

Electrodynamic characteristics of the crack which have been cut in a wide wall of a rectangular wave guide are investigated. In resonant and non-resonant wave guide slot-hole aerials, one of the reasons of loss of capaci...

Download PDF file
  • EP ID EP625382
  • DOI -
  • Views 117
  • Downloads 0

How To Cite

O. Vusyk, A. Pyzhyk (2019). Determination of rational conditions of application of rock layered milling combines on iron ore pits. Вісник Житомирського державного технологічного університету. Серія: Технічні науки, 83(1), 236-241. https://europub.co.uk/articles/-A-625382