Determination of the efficiency of electric power production by nuclear power plants using to the methodology of full energy costs. Part 3. Energy consumption for operation and decommissioning of plants and determination of their overall efficiency
Journal Title: Проблеми загальної енергетики - Year 2018, Vol 0, Issue 4
Abstract
The results of determination of the efficiency of electric power production by nuclear power plants with WWER-1000 reactors according to the methodology of full energy costs are presented. The procedure for determining the efficiency of technologies by this methodology was published earlier. In part 1 of this article, which was published in the 2nd issue of «The Problems of General Energy» for 2018, one can find calculated values of the total energy costs for the construction of nuclear power plants. In part 2 of the article, which is published in the 3rd issue of «The Problems of General Energy» for 2018, we present the results of calculations of energy expenditure for the receipt of nuclear fuel, which is necessary for the work of NPP during its lifetime. Part 3 covers the questions of energy costs for the operation of a large NPP with a power of 3.0 GW and the cost of its decommissioning and determines the final characteristics of its energy efficiency. As a result of these calculations, it was established that the efficiency of power generation at NPPs in the case of invariable rate of the National Bank of Ukraine (NBU) relative to the foreign exchange rates at an average UAH inflation of 7.5% is practically zero. Namely, the coefficient of energy efficiency of power generation at NPPs has a level of 1.106, which is evidence of the almost total expenditure of energy produced by the NPP for its own existence and reproduction. This also shows the unprofitableness of targeting to the purchase of technologies, equipment and materials for the operation of power units for import at the NBU exchange rates. The efficiency of power generation at NPPs at the rate determined by the parity of the purchasing power of US dollar in Ukraine (energy efficiency factor is 1.88), shows that 88% of the electricity generated by this NPP is predicted to be useful for the people. This also indicates the efficiency of using domestic technologies, equipment and materials for the operation of power facilities.
Authors and Affiliations
Victor Bilodid
Use of the program «SPROS» for predicting the demand for energy resources
The paper presents the structure, working principle, and interface of the developed new computer program «SPROS», which enables one, to perform fast calculations of the projected demand for all types of fuel and energy w...
Prospects of gas production industry in Ukraine
Nowadays the gas industry is one of the major components of the fuel and energy sector in Ukraine, and key issue of energy security is to increase domestic production of natural gas. The article analyzed the resource po...
Application of the method of complex forecasting for the determination of long-term demand for energy resources
We describe the specific features of applying the complex method of forecasting of the long-term demand for energy resources, in particular, coal, natural gas, and electric energy. These features lie in taking into accou...
Influence of operating parameters and non-equilibrium conversion on the characteristics of thermochemical recuperation of the heat of gases of high-temperature installations
We have performed the calculations of thermodynamic of parameters of thermochemical recuperation (TCR) of the heat of exhaust gas of industrial furnaces and internal combustion engine (ICE), which burn natural gas. TCR i...
Substantiation of the predictive volumes of energy saving potential in the enlarged sectors of economy with regard for technological and structural changes Language: Ukrainian
We have refined the forecast of gross domestic product for short-, medium- and long-term prospects according to the results of investigations of leading foreign and Ukrainian institutions. We have developed the new predi...