Development and Experimental Investigation on Delay Time Consistency of Modified Si/PbO/Pb3O4/FG Pyrotechnic Delay Composition
Journal Title: Engineering, Technology & Applied Science Research - Year 2017, Vol 7, Issue 6
Abstract
In the present study, experimental investigation was carried out on the delay time consistency of modified Si/PbO/Pb3O4/FG pyrotechnic delay composition in a delay tube. Where Si is the fuel, PbO/Pb3O4 are oxidizers and Fish Glue (FG) is the binder. Ingredient mixing and loading pressure were studied. Results revealed that homogenous mixing of the delay composition is a very critical parameter for controlling the time consistency of pyrotechnic delay composition. The delay time accuracy was improved from 25% to about 7.42% by ensuring homogenous mixing of the ingredients. Results also show that loading pressure ranged from 30,000 to 65,000 psi did not affect much the delay time of this pyrotechnic composition and the burning rate.
Authors and Affiliations
Α. Khan, Z. H. Lodhi, A. Q. Malik
Impacts of Soil Contamination on the Response of Piles Foundation under a Combination of Loading
The behavior of single piles driven into contaminated clayey soil samples subjected to a combination of static axial and cyclic lateral loadings have been studied in this research. A laboratory model was manufactured esp...
A Review of Ground Target Detection and Classification Techniques in Forward Scattering Radars
This paper presents a review of target detection and classification in forward scattering radar (FSR) which is a special state of bistatic radars, designed to detect and track moving targets in the narrow region along th...
Model and Reduction of Inactive Times in a Maintenance Workshop Following a Diagnostic Error
The majority of maintenance workshops in manufacturing factories are hierarchical. This arrangement permits quick response in advent of a breakdown. Reaction of the maintenance workshop is done by evaluating the characte...
High-level Synthesis Integrated Verification
It is widely known in the engineering community that more than 60% of the IC design project time is spent on verification. For the very complex contemporary chips, this may prove prohibitive for the IC to arrive at the c...
Evaluation of Road Traffic Accidents (RTAs) on Hyderabad Karachi M-9 Motorway Section
Pakistan is a developing country and its development depends upon its transports facilities. This paper describes the findings of a survey for the evaluation of road traffic accidents (RTAs) that focused on the Hyderabad...