Abstract

<p>According to the results of the theoretical analysis of well-known and widely practically applied standards of quality management and project management, as well as models of maturity assessment of processes, 13 key risk-dominant factors influencing the maturity of project quality management processes have been identified.</p><p>A methodology of ranking risk-dominant factors, which highly influence the organizational maturity of quality management processes in projects, has been developed. The basis of the developed methodology is the expert method. A distinctive feature of the methodology when it is implemented is to obtain a nomenclature of ranked key risk-dominant factors, taking into account the expertise of experts. This result is achieved through the involvement of two target groups, «Process Implementers» and «Consumers of the Process Results and Stakeholders», for peer review. A systematic scientifically-based ranking of risk-dominant factors in accordance with the proposed methodology contributes to the objective assessment of the potential of quality management processes in projects. In addition, it will increase the likelihood of obtaining expected results of processes and will determine the priority directions of growth and organizational changes of processes to achieve the target levels of maturity. The proposed methodology can be implemented in the processes of certification, self-assessment and auditing in a QMS.</p><p>The practical testing of the proposed methodology was carried out using the example of the «Project Launch» process. According to the results of the expert evaluation of the «Process Implementers», it has been established that the factor «The degree of documenting the process» and, to a lesser extent, the «The degree of applicability of the process evaluation results for its improvement» is influenced to a greater extent by the maturity of the investigated process. According to the results of the expert evaluation «Consumers of the Process Results and Stakeholders», the following has been established. To a greater extent, the maturity of the investigated process is influenced by the factor «The degree of the possibility of integrating the process with other internal and external processes. «To a lesser extent, the factor is «Behaviour of the process implementers». There is a high degree of consistency between expert assessments within each group and a significant connection between the assessments of the two groups of experts.</p>

Authors and Affiliations

Iryna Lazko

Keywords

Related Articles

Mathematical modeling of autonomous underwater vehicle propulsion and steering complex operation in oblique (beveled) water flow

<p>The research of nonlinear hydrodynamic characteristics of the propulsion and steering complex (PSC), which influence the accuracy of the plane trajectory motion of an autonomous underwater vehicle (AUV), is carried ou...

Analysis of the effect of ultraviolet irradiation on varroa mite

<p>We presented theoretical and experimental material on the influence of UV irradiation on a Varroa mite in the range of UVB and UVC in the study. We obtained mathematical expressions that simulate dependencies of elect...

Conversion of N-containing compounds of flash steam condensate from carbamide production into hydrazine sulfate

<p>Formation of 1.5 m<sup>3</sup> of wastewater per 1 ton of carbamide in the form of flash steam condensate accompanies carbamide production. It is necessary to purify flash steam condensate from nitrogen compounds by t...

Computer modeling of water cleaning in wetland taking into account of suffosion ang colmatation

<p>The mathematical model of filtering with regard to colmatation and suffusion in the system bioplato-filter 2. This saturated porous medium is considered in terms of a complex heterogeneous system "fill"-"concentration...

Analyzing an error in the synchronization of hydraulic motor speed under transient operating conditions

<p>A hydraulic drive with two hydraulic cylinders was considered in which the rod movement speeds are synchronized by a divider of the working fluid flow. Based on the developed mathematical model, operation of synchroni...

Download PDF file
  • EP ID EP528061
  • DOI 10.15587/1729-4061.2018.140796
  • Views 65
  • Downloads 1

How To Cite

Iryna Lazko (2018). Development of a method for ranking factors that influence the maturity of project quality management processes. Восточно-Европейский журнал передовых технологий, 4(3), 14-28. https://europub.co.uk/articles/-A-528061