Door Howling Cause Analysis and Countermeasures of Urban Rail Transit Train Passing through Tunnels
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 8
Abstract
Objective When the urban rail transit train with designed speed of 120 km/h passes through a tunnel at high speed, rear door howling problem of the tail car often occurs, seriously affecting passenger ride comfort. Thus the cause of this problem is studied in depth, and countermeasures are proposed. Method Taking the trains with serious howling in Zhengzhou-Xuchang City Railway as the research project, the causes of train door howling problem are analyzed from the aspects of door howling mechanism, vehicle internal and external pressure difference, and problems with the door itself. Aiming at the cause of door howling, targeted optimization measures are formulated from aspects of the blocking ratio between train and tunnel, the structure of door sealing rubber strip, and the compression amount of sealing rubber strip and so on. Stamping test is carried out by mounting doors with/without optimization on the same air-tight test bench. Result & Conclusion Door stamping test shows that under the same air intake volume, the maximum vehicle interior pressure increases from 1 400 Pa to 2 200 Pa after door optimization, and the door sealing performance is improved significantly, completely solving the problem of door howling.
Authors and Affiliations
Kainan MAO, Runtian LIU, Zhe WANG
Discussion on Integrated Supervisory Control System 2.0 for Urban Rail Transit
[Objective] In order to solve the deficiencies of the traditional integrated supervision and control system (ISCS) of urban rail transit, such as outdated system architecture, insufficient system integration and complex...
Analysis of Bearing-settlement Characteristics of Extra-long Bored Piles in URT Deep Soft Stratum Underground Station
Objective To effectively control the deformation of station structure during the excavation and usage of deep foundation pit in soft soil stratum, and to increase the bearing capacity of foundation pit bottom, it is nece...
Study on Anti-overturning Characteristics of 60R2 Groove Rail and CHN60 Rail for Fastener Type Ballastless Track of Tram
Objective In order to provide theoretical support for the selection and design of the tram rail and fasteners in different sections, it is necessary to study the anti-overturning characteristics of the 60R2 groove rail a...
Stress Analysis of Large-diameter Undersea Shield Tunnel Lining Segments during Construction Process
Objective To assess the engineering safety and reliability of undersea large-diameter shield tunnel structures, it is essential to analyze the stress on lining segments. Method Taking the lining segments of Dalian Railwa...
A Health Management Scheme for Urban Rail Transit Signaling System Power Supply Incorporating Lithium Battery Management
Objective To meet the reliability, maintainability, and safety requirements of the power supply for urban rail transit signaling system, and to enhance the stability of the signaling system power supply, it is necessary...