Electricity Supplier Switching Process in Poland – a  Process Based on the General Distribution Agreement

Journal Title: Acta Energetica - Year 2017, Vol 30, Issue 1

Abstract

Poland, as a Member State of the European Union, is committed to respect the common rules on the electricity market, among other things. One of the most important examples of these regulations is the perception of energy as a commodity subject to competitive market mechanisms. Competitive processes introduced in the national electricity market enable energy consumers, i.a., choice of electricity supplier under the TPA formula. This key right of consumers, embedded in the domestic electricity market for more than nine years, remains controversial and causes a lot of discussion. In this paper market conditions substantially influencing the switch of the electricity supplier in Poland have been presented. The electricity supplier switching process based on the general distribution agreement (GDA) has been discussed in detail. During the presentation, reference was made to all relevant regulations applicable to the issues raised, with particular emphasis on the provisions of the Distribution Grid Code (DGC) and the GDA template.

Authors and Affiliations

Rafał Łangowski

Keywords

Related Articles

Energy Effectiveness and Economic Performance of Gas and Gas-Steam Combined Heat and Power Plants Fired with Natural Gas

The paper presents the energy and economic effectiveness analysis of technological systems of gas and gas-steam combined heat and power (CHP) plants. For the analysis the following five technological systems of gas and g...

Issues of Estimating the Maximum Distributed Generation at High Wind Power Participation

This paper presents the methods of estimating the maximum power that can be connected to the power system in distributed generation sources. Wind turbine generator systems (WTGS) were selected as the subject for analysis...

Laboratory Power System Model Designed for Testing Dynamic Processes

Identification tests of dynamic and transient processes which occur in a power system are usually based on simulation. Structures of systems used for simulation testing are built from simplified models of power system co...

The Impact of a Power Electronics Converter in Phase Failure Work on the Power System Network

The paper presents the impact of phase failure work on power converters. The study includes a three-level NPC inverter (Neutral Point Clamped), controlled by Voltage Oriented Control (VOC). The NPC converter integrates r...

Application of the TETRA Wireless Communication System in the Power Industry

The article discusses the TETRA (Terrestrial Trunked Radio) wireless communication system in terms of its use in the power industry. It also discusses basic parameters of the system, its architecture, and possibilities o...

Download PDF file
  • EP ID EP198000
  • DOI 10.12736/issn.2300-3022.2017104
  • Views 59
  • Downloads 0

How To Cite

Rafał Łangowski (2017). Electricity Supplier Switching Process in Poland – a  Process Based on the General Distribution Agreement. Acta Energetica, 30(1), 39-44. https://europub.co.uk/articles/-A-198000