Electricity Supplier Switching Process in Poland – a  Process Based on the General Distribution Agreement

Journal Title: Acta Energetica - Year 2017, Vol 30, Issue 1

Abstract

Poland, as a Member State of the European Union, is committed to respect the common rules on the electricity market, among other things. One of the most important examples of these regulations is the perception of energy as a commodity subject to competitive market mechanisms. Competitive processes introduced in the national electricity market enable energy consumers, i.a., choice of electricity supplier under the TPA formula. This key right of consumers, embedded in the domestic electricity market for more than nine years, remains controversial and causes a lot of discussion. In this paper market conditions substantially influencing the switch of the electricity supplier in Poland have been presented. The electricity supplier switching process based on the general distribution agreement (GDA) has been discussed in detail. During the presentation, reference was made to all relevant regulations applicable to the issues raised, with particular emphasis on the provisions of the Distribution Grid Code (DGC) and the GDA template.

Authors and Affiliations

Rafał Łangowski

Keywords

Related Articles

Problems of Selecting Protection for Shunt Reactors Working in Extra-High Voltage Grids

This paper presents difficulties encountered when designing protection devices for shunt reactors connected directly to extra-high voltage grids. Using the example of the 400 kV Ełk Bis substation, it has been demonstrat...

Proposed Amendments to Reactive Energy Billing

This paper describes possible amendments to the rules of reactive energy billing in the tariffs in Poland. Modifications in the tariffs to improve their motivational function for distribution system users are identified...

Operational Parameters of Low Power ORC Biomass Plant

This paper describes a power plant with electrical/thermal capacity of 750 kW/3.4 MW launched in February 2015 by a private investor in Żory, Poland. The ORC Organic Rankine Cycle technology used there enables turbine op...

Ways of Improving the Reliability of Supply of Selected Important Municipal Customers in Municipalities

This paper reviews the most important ways to improve the reliability of supply of consumers, i.e. the increase in the number of directions of supply, use of grid and system automatic controls, and installation of distri...

The Method of Multi-criteria Analysis to Support the Decision on Load or Micro-generation Connection to a Low- or Medium-voltage Power Grid

This paper presents a method that supports the decision in terms on selecting the best option of a load connection to a low- or medium-voltage power distribution grid, and of a micro-generation source connection to a low...

Download PDF file
  • EP ID EP198000
  • DOI 10.12736/issn.2300-3022.2017104
  • Views 77
  • Downloads 0

How To Cite

Rafał Łangowski (2017). Electricity Supplier Switching Process in Poland – a  Process Based on the General Distribution Agreement. Acta Energetica, 30(1), 39-44. https://europub.co.uk/articles/-A-198000