Operation of a BC50 Cogeneration Unit of a CHP Plant in an Isolated Island System

Journal Title: Acta Energetica - Year 2016, Vol 26, Issue 1

Abstract

In a paper presented at the previous APE ‚13 conference [1] results of a concept of separating an island system with a BC50 thermal unit in VEOLIA ENERGY Poznan ZEC SA’s power plant (hereinafter ECII Karolin) were presented. The fol-lowing loads were selected for supply in the separated island system: EC II Karolin’s auxiliaries and general purpose loads, industrial loads in the plant’s immediate vicinity, and, in the future, municipal consumers. The concept of separation of the island supplied from BC50 unit requires comprehensive verification of the adopted assumptions through system experiments before the appropriate separation automation implementation. The paper presents selected results of the first experiment of the operation of the separated island system with a BC50 unit and the plant’s auxiliaries and general purpose loads plus an external consumer, i.e. a waste water treatment plant in the conurbation of Poznań.

Authors and Affiliations

Ireneusz Grządzielski, Krzysztof Sroka, Arkadiusz Łacny, Daria Radsak

Keywords

Related Articles

Evaluation of The Operation and Improvement of the Stability of the Factory Power Network, Taking into Account the Uncertainty of the Network Model Parameters

There was analysed the operation of a factory power network working in island mode and cooperating with the Polish National Power System (PNPS) in selected transient states. It was assumed that two generating units: one...

Identification of High-resistance Earth Faults in Medium Voltage Networks Using Higher Harmonics

One way to detect line-to-earth arc faults and high-resistance faults in compensated medium voltage networks is based on the criterion of reactive power of higher harmonics in zero sequence voltage and current components...

Analysis of Technical Possibilities of Photovoltaic and Wind Sources Playing in an Ancillary Service of Frequency and Power Regulation

Together with a growing share of renewable energy sources (RES) in the generation sector of power systems, the interest of power grid operators in the possibilities of their use for regulation purposes is growing. The po...

The Impact of a Power Electronics Converter in Phase Failure Work on the Power System Network

The paper presents the impact of phase failure work on power converters. The study includes a three-level NPC inverter (Neutral Point Clamped), controlled by Voltage Oriented Control (VOC). The NPC converter integrates r...

Laboratory Power System Model Designed for Testing Dynamic Processes

Identification tests of dynamic and transient processes which occur in a power system are usually based on simulation. Structures of systems used for simulation testing are built from simplified models of power system co...

Download PDF file
  • EP ID EP199780
  • DOI 10.12736/issn.2300-3022.2016102
  • Views 78
  • Downloads 0

How To Cite

Ireneusz Grządzielski, Krzysztof Sroka, Arkadiusz Łacny, Daria Radsak (2016). Operation of a BC50 Cogeneration Unit of a CHP Plant in an Isolated Island System. Acta Energetica, 26(1), 15-25. https://europub.co.uk/articles/-A-199780