Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill

Abstract

One of the efforts that must be undertaken by companies in the field of production is the production process should be designed as efficiently and effectively as possible. For that in the implementation of the production process of the need for planning and monitoring good production so lightweight brick production process can run well, so that later can increase the number of qualified products. The aim of research analyzing the quality standard time lightweight brick production process, method of data collection directly to the worker / operator in the process I Ball Mill and Raw Material. The research result analysis cycle time, normal time and standard time, then the part I. Process Ball Mill and Raw Material 1 operator obtained a standard time 67.86 minutes, Operator 2 is obtained standard time standard time acquired 36.20 minutes , Operator 3 is a standard time 56.95 minutes. Standard time or standard time gained to the three operators in the process I. Ball Mill and Raw Materials takes one time settlement activities in the amount of 161.01 minutes.

Authors and Affiliations

Keywords

Related Articles

Design, Construction and Performance Evaluation of Earth -to -Air Heat Exchanger for Room Cooling in Sokoto, Nigeria

The tropical climate is characterized by high ambient temperatures and solar radiation, a combination of these factors causes thermal discomfort in buildings. With the rapid increase in population and economic growth of...

AUTOMATED ACUTE MYELOGENOUS LUKEMIA DETECTION IN BLOOD MICROSCOPIC IMAGE

Acute Myelogenous leukemia (AML) is a subtype of acute leukemia. The current method of leukemia detection is by manual examination of the blood cells through the microscope. It very time consuming and also it depend on t...

Application Of Z-Transformation On Gambler’s Ruin In Probability Theory And Other Result

Z-transformation is one of the most popular tools to solve Mathematical, Physical, biological, electronic, control and signal processing systems and difference equation. The purpose of this research paper is to discuss t...

LIFETIME IMPROVEMENT OF WIRELESS SENSOR NETWORK USING NETWORK CODING AND ADAPTIVE DUTY CYCLE

Wireless sensor networks (WSNs) are composed of very low cost, low power consuming devices with sensing, signal processing and wireless communication systems. Minimizing energy consumption and maximizing network lifetime...

Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill

One of the efforts that must be undertaken by companies in the field of production is the production process should be designed as efficiently and effectively as possible. For that in the implementation of the production...

Download PDF file
  • EP ID EP216614
  • DOI -
  • Views 77
  • Downloads 0

How To Cite

(2016). Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill. International Journal of Advances in Scientific Research and Engineering, 2(1), 16-22. https://europub.co.uk/articles/-A-216614