Abstract

One of the efforts that must be undertaken by companies in the field of production is the production process should be designed as efficiently and effectively as possible. For that in the implementation of the production process of the need for planning and monitoring good production so lightweight brick production process can run well, so that later can increase the number of qualified products. The aim of research analyzing the quality standard time lightweight brick production process, method of data collection directly to the worker / operator in the process I Ball Mill and Raw Material. The research result analysis cycle time, normal time and standard time, then the part I. Process Ball Mill and Raw Material 1 operator obtained a standard time 67.86 minutes, Operator 2 is obtained standard time standard time acquired 36.20 minutes , Operator 3 is a standard time 56.95 minutes. Standard time or standard time gained to the three operators in the process I. Ball Mill and Raw Materials takes one time settlement activities in the amount of 161.01 minutes.

Authors and Affiliations

Keywords

Related Articles

MATHEMATICAL MODELING OF CARDIAC BLOOD FLOW IN HUMANS

Lumped parameter model is a very useful type of mathematical modelling where the physical system is made analogous to an electrical network. Lumped parameter model is represented graphically by a circuit diagram in which...

Effect of Flame Hardening and Various Quenching Medium on the Mechanical and Metallurgical Properties of Grey Cast Iron Lathe Bed

Grey Cast iron is the most commonly used material in lathe bed. The properties of grey cast iron before and after the flame hardening process for different quenching medium is studied and analysed. The three quenching me...

Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill

One of the efforts that must be undertaken by companies in the field of production is the production process should be designed as efficiently and effectively as possible. For that in the implementation of the production...

Design and Analysis of Rudder Hinges of an Aircraft

On an aircraft, the Rudder is one of the important directional control surface along with the rudder-like elevator (attached to the vertical stabilizer) and ailerons (attached to the wings) that control pitch and roll, r...

DESIGN AND DEVELOPMENT OF GLASS FIBER REINFORCED POLYMER MATRIX COMPOSITES FOR ENGINEERING APPLICATION

An experimental investigation has been carried out to develop new PMC using commercially available Epoxy and Polyurethane resin systems. These resin systems would be reinforced with glass fibers, filler materials and alu...

Download PDF file
  • EP ID EP216614
  • DOI -
  • Views 78
  • Downloads 0

How To Cite

(2016). Estimation of Standard Time in Production of Light Weight Brick Manufacturing Using Ball Mill. International Journal of Advances in Scientific Research and Engineering, 2(1), 16-22. https://europub.co.uk/articles/-A-216614