Expert systems in assessing the construction process safety taking account of the risk of disturbances

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2018, Vol 189, Issue 3

Abstract

The objective of the paper is to present the issue of safety management during the construction process. Threats in the form of disturbances may occur in the preparatory phase, during the execution of the construction project and also during its operational use. The article presents the concept of applying the methodology based, among others, on Learning Bayesian Networks, Artificial Neural Networks and Support Vector Machine, which can be used for building a system for diagnostic and decision-making support at each stage of the construction process. The use of expert systems when it comes to making choices related to construction issues can bring many benefits to decision-makers, as it reduces the risk of taking a wrong decision, and, thus, increases the construction process safety.<br/><br/>

Authors and Affiliations

Agata Siemaszko, Anna Jakubczyk-Galczynska, Beata Grzyl

Keywords

Related Articles

CIVIL WAR IN MEMORY OF GREEK REPATRIATES FROM POLAND AND OTHER EASTERN BLOC COUNTRIES

The paper is based on anthropological study fieldwork conducted in Greece during the three subsequent research seasons of 2005-2009. The Greek Civil War (1946-1949) broke out after World War II and it reflected the confl...

METHODS OF IMPROVING COMBAT EFFECTIVENESS OF HIGH-EXPLOSIVE AND HIGH-EXPLOSIVE-FRAGMENTATION PROJECTILES

The mechanism of the influence of shock wave and splinters on the different types of targets is shown in this paper. The construction of present-day artillery ammunition and the methods of improving the fragmentation eff...

REVIEW OF MILITARY GAP-CROSSING BRIDGES IN US ARMY

The authors of this article present a review of military gap-crossing bridges in the US Army. The article contains a classification of military bridges according to their purpose, place in a combat formation and employme...

PRELIMINARY CONCEPT OF EXPEDIENT/BATTLE DAMAGE REPAIR SYSTEM FOR THE POLISH ARMED FORCES

The paper presents the expedient/battle damage repair of weapon system preliminary concept for The Polish Armed Forces which should be introduced in order to fulfil NATO standardization agreements. The proposed concept w...

NEW FACE OF FORWARDING IN POLISH ARMED FORCES

The functioning of armed forces is inseparably connected with transfers of both personnel and cargo. To properly organise this sphere of the armed forces’ activity requires committing substantial military logistic human...

Download PDF file
  • EP ID EP395736
  • DOI 10.5604/01.3001.0012.6239
  • Views 67
  • Downloads 0

How To Cite

Agata Siemaszko, Anna Jakubczyk-Galczynska, Beata Grzyl (2018). Expert systems in assessing the construction process safety taking account of the risk of disturbances. Scientific Journal of the Military University of Land Forces, 189(3), 218-227. https://europub.co.uk/articles/-A-395736