Faktor-Faktor yang Mempengaruhi Contract Change Order pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki
Journal Title: Sultra Civil Engineering Journal - Year 2022, Vol 3, Issue 1
Abstract
The research was conducted using descriptive statistical methods, namely by analyzing data and questionnaires to determine the mean and then calculating the value of the Relative Interest Index (IKR). This analytical method will be very useful for identifying the rank of respondents and giving priority to study variables. The results showed that the factors causing CCO were the effect of cost (0.362) with a t count of 0.869. The dominant factors causing Contract Change Order (CCO) that affect cost and time are the contractor factor, then the influence of cost, natural conditions, planning & design, time, and the lowest one is the owner's influence.
Authors and Affiliations
Rajanun Rajanun, Irwan Lakawa, Sitti Hawa, Haryono Haryono, Sufrianto Sufrianto
Evaluasi Kinerja Layanan dan Tingkat Kepuasan Pelanggan Angkutan Penyeberangan Amolengo-Pure Provinsi Sulawesi Tenggara
Indonesia is a large country that is widespread with it’s islands and is a country traversed by the Equator, so sea transportation has an important role to play in connecting one area to another, considering that Indones...
Analysis of Construction Workers' Perceptions of Company Services (Case Study: PT. Konawe Multi Usaha)
In supporting the success of infrastructure development, it is necessary to have good cooperation between owners, contractors and workers which must be supported by the implementation of a project management system. A co...
Analisis Normalisasi Sungai Baubau
The durability of the road flexural pavement structure is largely determined by the performance of each layer. One of these factors is the strength and resilience of the subbase. Compaction in accordance with applicable...
Evaluasi Kinerja Trayek AKDP Dari Terminal Baruga Ke Berbagai Jurusan Di Wilayah Provinsi Sulawesi Tenggara
This study aims to evaluate the current performance of urban transportation within the province and analyze the need for urban transportation modes within the province. The data analysis technique uses mathematical equat...
Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana
This study aims to analyze the factors that influence the quality of the implementation of improving the Tedubara-Pising street in Bombana Regency. This study uses quantitative data analysis techniques with a sample size...