HSE MANAGEMENT SYSTEM AT HIGH ELEVATION IN SHIPBUILDING PROJECT
Journal Title: INTERNATIONAL JOURNAL OF ENGINEERING TECHNOLOGIES AND MANAGEMENT RESEARCH - Year 2018, Vol 5, Issue 11
Abstract
The Shipyard industry is one of the growing industry in Malaysia. There is still a lot of room for improvement with regards to the safety aspects within the industry. This study presents the finding of a survey on the safety management in shipyard operation of class C and D in Peninsular Malaysia as registered with Ministry of Finance Malaysia. Shipyard operation is considered a hazardous job. Most of the cases were due to fall from height, fire and explosion. The accidents were due to crane collapsed and explosion during welding works inside a hull of a Liquefied Petroleum Gas (LPG) carrier. The research aims to study the Health, Safety and Environment Management System (HSEMS) of shipyard operations in Malaysia particularly in Class C and Class D. This study was conducted using a survey method following the Glenn D’s equation. The findings of this study shown that almost all the shipyards had HSEMS in placed but some were incomplete. Accidents still happen in the Malaysian shipyard industry from time to time. Nearly 10% of shipyards did not have clear HSE Policy due to low priority given to HSE matters.
INTERNET OF THINGS (IOT) BASED ADVANCED ONLINE EXAMINATION USING RASPBERRY PI
In this research we have proposed IOT based advanced Online examination using Raspberry pi for Alarm system and border security. With the event of recent education, considering the defect of current online exam system, a...
IMPORTANCE, ISSUES AND CONTROL OF MICROGRID
Utilization of distributed energy resources and power stability related problems are becoming of most importance in the pursuit for a more sustainable power system. Microgrids (MGs) could contribute significantly to both...
CORRUPTION AND INSTITUTIONAL INTEGRITY: THE CASE OF BANGLADESH
This paper highlights the view that corruption can be combated if institutional integrity can be put into practice, i.e. ‘institutional integrity’ has been considered as a key strategy to curb corruption. Based on litera...
QUANTIFICATION OF PLEURAL EFFUSION ON CT IMAGES BY AUTOMATIC AND MANUAL SEGMENTATION
The objective of this research is to make reliable estimation of pleural effusion volume in CT imaging using digital image processing algorithms. In order to make reliable estimation we need to do the manual and automati...
A CASE STUDY ON PRE-TENSIONING & POST TENSIONING SYSTEMS OF A PRESTRESSED CONCRETE
In Present days the pretensioning and post tensioning systems are very popularly using in the major constructions of a structure. The Pre-tensioning and Post-tensioning both methods are used under pre-stressing process....