Identification and mapping of project stakeholders: criteria and methods

Journal Title: Scientific Journal of the Military University of Land Forces - Year 2018, Vol 187, Issue 1

Abstract

A key issue for stakeholder management is to determine who, to what extent and why can influence a project. Proper identification of stake-holders and their classification according to the criteria adopted al-lows for defining their hierarchy, strength and impact on the project. This, in turn, conditions the development of a strategy for dealing with individual stakeholder groups. The definitions of the concept of a stakeholder have been reviewed to determine the identification crite-ria. The article also attempts to systematize methods of qualifying stakeholders, depending on the number of differentiation criteria. The methods used for the qualification of stakeholders are often presented graphically.<br/><br/>

Authors and Affiliations

Wojciech Downar

Keywords

Related Articles

Modernization of the Missile Forces and Artillery

The article analyses and assesses current capabilities of the Missile and Forces Artillery of the Polish Armed Forces as well as a role which should be played by artillery in conditions of a contempo-rary battlefield. By...

SOCIAL NORMS IN THE CONTEXT OF PREVENTION AND EDUCATION.THE STUDY OF SOCIAL PRACTICE

The author of this article presents the process of defining social norms in the context of education. The author points to processes influencing the reduction of deviation circles by exploiting education while under...

URZĄDZENIA DO POMIARU PRĘDKOŚCI POCISKÓW ARTYLERYJSKICH

W artykule przybliżono treści związane z historią powstawania urządzeń do pomiaru prędkości początkowej pocisków artyleryjskich, ich budowę i zasady działania. Podjęto także próbę charakterystyki kierunków rozwoju tych u...

LEGAL REGULATIONS IN THE FIELD OF CULTURAL HERITAGE PROTECTION IN POLAND IN THE YEARS 1944-1989 IN TERMS OF CULTURAL SECURITY OF THE COUNTRY

The article attempts to analyze the meaning of legal regulations developed in the field of cultural heritage protection in the years 1944-1989. It has been argued that these years were markedly different in terms of law...

INDEPENDENT DECONTAMINATION IN SUBUNIT

The authors of the article present the general construction and the application of the BZLS battalion decontamination set. Since this equipment is a technological innovation, the article focuses on the implications relat...

Download PDF file
  • EP ID EP345140
  • DOI 10.5604/01.3001.0011.7370
  • Views 67
  • Downloads 0

How To Cite

Wojciech Downar (2018). Identification and mapping of project stakeholders: criteria and methods. Scientific Journal of the Military University of Land Forces, 187(1), 165-179. https://europub.co.uk/articles/-A-345140