Impact of Small Clearance Bored Pile Construction under Rail Transit Bridges in Soft Soil Area

Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7

Abstract

Objective The impact of small clearance construction between bored piles and piers of operational rail transit bridges in China′s coastal soft soil areas is becoming a bottleneck factor restricting urban rail transit planning and construction. Therefore, it is necessary to study the impact of small clearance bored pile construction on the deformation of surrounding strata and bridge piers. Method Taking an ongoing project of urban road pile-slab structure under passing the rail transit bridge in Zhejiang Prov. as example, through designing soil lateral deformation monitoring tests and building a displacement smart monitoring system for bridge and piers, the coordinated deformation characteristics between deep soft soil strata and inclinometer boreholes are analyzed, together with the impact law of bored pile construction on the deformation of surrounding strata and bridge piers. Result & Conclusion To ensure good coordination in deformation between inclinometer boreholes and strata, inclinometer boreholes in soft soil areas should remain for 6 days after the completion of construction. The sensitivity of the silt layer to the construction loading and unloading process is high, resulting in the maximum deformation of soft soil strata induced by construction. Under construction conditions, the deformation amplitude of the bridge piers in three directions is about 2 to 3 times that of non-construction conditions. The drilling excavation process and concrete pouring process have a significant disturbance effect on the depth direction of bridge piers. Therefore, the monitoring focus of construction beneath operational rail transit bridges should be put on vertical displacement.

Authors and Affiliations

Zhaobin ZHU

Keywords

Related Articles

Basic and Alternative Route Determination in Interlocking Table and Conflicting Signal Verification for Urban Rail Transit Depot

[Objective] As the standard for debugging, opening, acceptance, and subsequent use of computer interlocking devices, the interlocking table plays a crucial role in improving operation efficiency, extending equipment life...

Research on the Matching Relationship between Backflow Device and Special Rail of Urban Rail Transit Vehicles

Objective The stray current generated during the operation of urban rail transit vehicles with rail backflow method will cause electrical corrosion to nearby metal objects, while the special rail return mode can solve su...

Study on Deformation Control Value for Urban Rail Transit Foundation Pit Project

Objective Setting deformation control values for the monitored project and controlling the construction safety is a very important task in the construction of urban rail transit engineering, aiming to ensure the stabilit...

Analysis on the Performance of New Mountain Gear Rail Train Brake

Objective The maximum slope of the mountain gear rail line can reach 250‰. As the sliding force generated by the component of the gravity is much greater than the maximum friction force between wheel and rail, relying so...

Control Circuit Optimization for High-speed Circuit Breaker in Traction System of Jinan Metro Line 3

[Objective] In the early operation stage of Jinan Metro Line 3, multiple sporadic high-speed circuit breaker closing failures are reported. To improve the reliability of train operation, it is necessary to optimize the h...

Download PDF file
  • EP ID EP742610
  • DOI 10.16037/j.1007-869x.2024.07.026
  • Views 15
  • Downloads 0

How To Cite

Zhaobin ZHU (2024). Impact of Small Clearance Bored Pile Construction under Rail Transit Bridges in Soft Soil Area. Urban Mass Transit, 27(7), -. https://europub.co.uk/articles/-A-742610