Implementing Earned Value Management in Immature Organizations

Journal Title: International Research Journal of Applied and Basic Sciences - Year 2013, Vol 6, Issue 3

Abstract

In this paper we have reviewed especial features of immature Organizations and described an adapted framework for implementing Earned Value management. We seek to provide a simple process that enables organizations and mangers to utilize Earned Value management capabilities without need to have very perfect knowledge about seemly hard aspects of EVM technique. In addition we have suggested some piece of advices about better implementation of EVM in this space.

Authors and Affiliations

Ali Kia| Department of Industrial Management, Tehran Jonoob Azad University, Tehran, Iran, Hadi Alizadeh *| Departments of Industrial Engineering, Iran University Of Science &Technology, Tehran, Iran, email: [email protected], Mohamad Ali Abedini Manshadi| Department of Industrial Management, Tehran Jonoob Azad University, Tehran, Iran

Keywords

Related Articles

Reviewing Distribution and Calculation of the Radius Spread of a Biological Infection during a Biological Event

Crisis is such a situation in which sudden events occur uncontrollably and threaten human life and the environment. When the contaminants are transferred from the source to the receiver, they scatter in the surrounding e...

A new approach to optimization of generation expansion planning using multi-period multi-objective framework

This paper describes using a new approach to solve multi-period multi-objective optimization of generation expansion planning (MMGEP) problem in deregulated power systems over a long term planning horizon. The model opti...

Vermicompost as a soil supplement to improve growth of tomato (Lycopersicum esculentum)

The effects of vermicompost on the growth of tomatoes (Lycopersicum esculentum) (c.v. Polard) was investigated in a greenhouse experiment. Five levels vermicompost treatments including: 0, 10, 20, 30 and 40 % (w/v) were...

The influence of personality traits of customers on their loyalty A case study Of private banks of Kermanshah

Today, banks and service companies, though, are looking for Customer's Loyalty, But to indulge them They must plan based on their customer's aims,it is not possible to recognize their demands Without knowing their person...

The relationship between social skills and identity dimensions with problem solving process

The purpose of this study is to investigate the relationship between social skills and identity dimensions with problem solving process. The subjects include all female high school students of Jam town (Bushehr province)...

Download PDF file
  • EP ID EP6135
  • DOI -
  • Views 193
  • Downloads 9

How To Cite

Ali Kia, Hadi Alizadeh *, Mohamad Ali Abedini Manshadi (2013). Implementing Earned Value Management in Immature Organizations. International Research Journal of Applied and Basic Sciences, 6(3), 353-358. https://europub.co.uk/articles/-A-6135