IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING

Abstract

This article is devoted to the features of improving well construction efficiency, namely, the stationary problem of incompressible fluid inflow into a complex-geometry well. This problem is solved in two dimensions: infinite vertical permeability and zero vertical permeability of formation. We have also measured the increase in the flowing well flow rate in the context of forming long (up to three meters) filtration channels with drills. Currently, there are no effec-tive technologies in this area. Thus, our paper is relevant and significant. This study allows us to conclude that using the proposed drill allows making maximum depth filtration channels.

Authors and Affiliations

Olga Savenok, Ashot Arutyunyan, Evgeniy Petrushin

Keywords

Related Articles

THE INFLUENCE OF ADDITIONAL DISCHARGE OF THE BRAKE LINE ON THE LONGITUDINAL DYNAMICS OF THE TRAIN DURING BRAKING

The importance of the problem under study is related to the need to solve a number of problems arising with the formation of long-freight trains. The purpose of the article is to analyze various brake systems of wagons o...

HIGH PERFORMANCE WATER TREATMENT TECHNOLOGY FOR THE RESERVOIR PRESSURE MAINTENANCE AT OIL FIELDS

This article considers the problem of deterioration of permeability of reservoirs in the bottom-hole zone, as well as the problem of decrease of water intake capacity of water injection wells due to colmatation of pores...

RESEARCH OF THE INFLUENCE OF THE HOOK LOAD OF THE UNSTABLE CHARACTER ON THE OPERATING INDICATORS OF THE ENERGY MEANS

When the machine-tractor unit (MTU) performs agricultural operations, there are significant fluctuations in the hook load, that is, the load of the tractor engine is unsteady in its characteristics, and the degree of une...

ENVIRONMENT-FRIENDLY LOGGING IN THE CONTEXT OF WATER LOGGED SOIL AND KNOB- AND-RIDGE TERRAIN

Wood is an important building material. However, its major reserves are in hard-to-reach are-as, such as water-logged soils, mountain and knob-and-ridge terrains. This situation leads to large wood extraction costs, beca...

APPLICATION OF THE AUTOMATED SYSTEM-COGNITIVE ANALYSIS FOR SOLVING PROBLEMS OF GENETICS

This article describes an approach that provides the calculation of the amount of information in the genes about the characteristics or properties of different grape cultivars. A specific phenotypic property is considere...

Download PDF file
  • EP ID EP404733
  • DOI 10.26480/jmerd.02.2018.28.30
  • Views 83
  • Downloads 0

How To Cite

Olga Savenok, Ashot Arutyunyan, Evgeniy Petrushin (2018). IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING. Journal of Mechanical Engineering Research & Developments (JMERD), 41(2), 28-30. https://europub.co.uk/articles/-A-404733