Integration of the software for management of construction processes
Journal Title: Вісник Одеської державної академії будівництва та архітектури - Year 2017, Vol 1, Issue 67
Abstract
At the current stage, it is important to combine programs in various areas of construction organizations activity (design, design calculation, budget calculations, project management) into a single information space. Goal and tasks. To identify the most rational software for managing construction projects in accordance with the current needs of construction organizations. The study was conducted using system and process approaches as tools for effective management of construction projects, a general theory of organization and management, theory and practice of network planning, mathematical modeling. The conducted researches showed that the program complex Building Manager in comparison with other well-known project management programs has a number of undeniable advantages: 1) Nowadays, this is the only program that allows you to build the calendar and corresponding resource schedules based on the 3-d model. 2) It is well associated with value-based programs, and the interaction is possible both directly and indirectly, that is, if the calendar schedule, supplies, production technology changes, it is possible to return to the value determination programs and adjust the indicators, in accordance with the changes. Conclusions: ‒ the basic directions of the software management work perfection by building projects are defined; ‒ for the first time, a rational software for managing construction projects, which is fully integrated into a single technological line or BIM technology has been identified.
Authors and Affiliations
A. V. , Bespalova, A. Y. , Sebova, V. I. , Ravinov
Coverings for ensuring the movement of individual environmental transport
This article analyzes the state and development of bicycle lanes infrastructure in European countries. Comparative data on the load of bicycle transport in some countries of the world are given in the work (number of bic...
The use of pressure flotation in the water treatment stations
Classical technological schemes for the purification of natural waters become ineffective against pollutants, whose presence in water or increase in their concentration has not been taken into account in the design. The...
Tthe medicine and architecture of healthcare institutions at contemporary times in Ukraine
Ukraine development time frames in the years since Hetman P. Skoropadsky's management, the pre-revolutionary period, First and Second World Wars, the remedy period, the Soviet time are considered in the article. The open...
Influence of micafume product on the processes of the structure formation of the alkaline cement
The influence of the micafume product of of auriferous ore flotation waste on the structure formation of alkaline slag cement was studied. It has been established that the additive in the form of a micafume containing pr...
Ecological irrigational assessment of surface water quality of the sasyk reservoir
In the article the results of the ecological irrigational assessment of surface water quality of the Sasyk Reservoir in 1995 ... 2015 are presented by various principles: integrated ecological assessment of water quality...