Integration of the software for management of construction processes
Journal Title: Вісник Одеської державної академії будівництва та архітектури - Year 2017, Vol 1, Issue 67
Abstract
At the current stage, it is important to combine programs in various areas of construction organizations activity (design, design calculation, budget calculations, project management) into a single information space. Goal and tasks. To identify the most rational software for managing construction projects in accordance with the current needs of construction organizations. The study was conducted using system and process approaches as tools for effective management of construction projects, a general theory of organization and management, theory and practice of network planning, mathematical modeling. The conducted researches showed that the program complex Building Manager in comparison with other well-known project management programs has a number of undeniable advantages: 1) Nowadays, this is the only program that allows you to build the calendar and corresponding resource schedules based on the 3-d model. 2) It is well associated with value-based programs, and the interaction is possible both directly and indirectly, that is, if the calendar schedule, supplies, production technology changes, it is possible to return to the value determination programs and adjust the indicators, in accordance with the changes. Conclusions: ‒ the basic directions of the software management work perfection by building projects are defined; ‒ for the first time, a rational software for managing construction projects, which is fully integrated into a single technological line or BIM technology has been identified.
Authors and Affiliations
A. V. , Bespalova, A. Y. , Sebova, V. I. , Ravinov
bearing capacity of compressed steel reinforced concrete structural elements using shaped pipes with cavities for engineering communications
In some cases, during the design and construction of buildings and structures, there is a need to hide engineering networks within the bearing structures. For this purpose it is advisable to use cavities for engineering...
Vibration test of brickwork fragments with reinforced concrete core
Modern methods of diagnostics should provide the ability to quickly and fully assess the actual characteristics of buildings structures evaluation, be simple and mobile enough to be used during the design, construction,...
Scientific and practical bases of increasing the durability of modified concrete on lightweight aggregates for thin-walled hydraulic structures
It is shown that to improve the durability and mechanical properties of concrete on porous aggregates, technological operations are useful, which improve the joint action of the aggregate and the cement-sand matrix. In p...
Improving the design and calculation methods of precast-monolithic anti-seismic belt of buildings
The article is devoted to seismic resistance of buildings with new precast-monolithic belts. They, unlike monolithic ones, are performed in one cycle together with the laying of floors, without formwork and without inter...
Mathematical model calculating the duration of construction
Improvement of the methodological principles of scheduling allows to solve the problems of exceeding the terms of construction. Compliance to the calendar plan of works has a direct impact on the construction`s duration...