Linia metra nr 4 / Zielona w Budapeszcie

Journal Title: Technika Transportu Szynowego - Year 2018, Vol 289, Issue 5

Abstract

The Green Line of the Budapest underground was commissioned at the end of March 2014 and the connection of the Kelenföld and the Keleti railway station was built with the Danube underground tunnel. It is planned to build the sections in both directions, i.e. the current fragment (~ 7 km) is to become the central section. Additionally, two sections will be built in the east and one in the west direction. The Green Line is full automatic and the rolling stock – the Metropolis trains were produced by Alstom. The construction of the line was accompanied by numerous controversies, including low transparency of tender procedures, attempts to cancel the rolling stock contract, etc.

Authors and Affiliations

Marek Graff

Keywords

Related Articles

Transport szynowy w obsłudze logistycznej mieszkańców miast

The dynamic development of modern cities entails economic, social, cultural and ecological problems. Pollution emissions, noise, traffic accidents and congestion are typical negative environmental and social phenomena. T...

Techniczno-prawny aspekt użytkowania tramwaju na polskich torach tramwajowych i kolejowych

In 2017, according to the interoperability regulations of the European railway system of the EU countries, a regulation [5] appeared, which may facilitate the introduction of a two-system tram in Polish cities. A number...

Strategia Grupy PKP S.A. – elementy logistyczne i organizacyjne

Implementing the PKP S.A. strategy shall ensure preparing the Polish railway transport for the upcoming challenges. Macroeconomic trends clearly indicate the necessity to develop multimodality of people and cargo transpo...

6. Międzynarodowa Konferencja NEXTSTATION 2017

W dniach 19–21 października 2017 r. w Madrycie odbyła się kolejna z cyklu konferencji dotyczących zagadnień stacyjnych. Tegoroczna edycja, pod hasłem Smart Station in Smart City została zorganizowana pod patronatem Minis...

Projektowanie rozwoju publicznego transportu zbiorowego w planach transportowych na przykładzie województwa pomorskiego

The dynamic development of individual motorisation causes a decrease in the number of passengers using public transport and a decline in the profitability of the communication lines. As a result, carriers providing servi...

Download PDF file
  • EP ID EP499213
  • DOI -
  • Views 33
  • Downloads 0

How To Cite

Marek Graff (2018). Linia metra nr 4 / Zielona w Budapeszcie. Technika Transportu Szynowego, 289(5), 15-20. https://europub.co.uk/articles/-A-499213