LNG Import Contract in the perspective of Associated Technical and Managerial Challenges for the Distribution Companies of Pakistan

Abstract

Energy Managers and Government Office Holders in Pakistan are nowadays pondering over multiple options for the resolution of ongoing Energy crises in the country. LNG (Liquefied Natural Gas) import has been finalized for being the quickest remedy among all the available options. LNG (Liquefied Natural Gas) contract is at the verge to be implemented in Pakistan. However there are several factors that need to be addressed while implementing the project. In this paper, identification of the challenges affecting the optimized distribution of gas is presented. The sustainability of LNG (Liquefied Natural Gas) Project depends upon the successful running of the project without facing any financial crises arising from the gas distribution losses. The motive of this paper is the identification of the factors that are risk for the sustainability and successful running of LNG Import in Pakistan on long term basis. In association it is required to identify technical and managerial challenges for the gas distribution companies in distribution of LNG. Moreover recommendations are proposed for modification in existing infrastructure and governing policies related to gas distribution companies for logical success and long term sustainability of LNG import in Pakistan

Authors and Affiliations

Kawish Bakht, Farhan Aslam, Tahir Nawaz, Bakhtawar Seerat

Keywords

Related Articles

A New Hidden Web Crawling Approach

Traditional search engines deal with the Surface Web which is a set of Web pages directly accessible through hyperlinks and ignores a large part of the Web called hidden Web which is a great amount of valuable informatio...

Solving the Free Clustered TSP Using a Memetic Algorithm

The free clustered travelling salesman problem (FCTSP) is an extension of the classical travelling salesman problem where the set of vertices is partitioned into clusters, and the task is to find a minimum cost Hamiltoni...

Performance Comparison of Detection, Recognition and Tracking Rates of the different Algorithms

This article discusses the approach of human detection and tracking in a homogeneous domain using surveillance cameras. This is a vast area in which significant research has been taking place from more than a decade and...

Ranking XP Prioritization Methods based on the ANP

The analytic network process (ANP) is considered one of the most powerful tools to facilitate decision-making in complex environments. The ANP allows decision makers to structure their problems mathematically using a ser...

Learner Cognitive Behavior and Influencing Factors in Web-based Learning Environment

In educational institutions, to improve student learning outcome and performance, the information and communication technology has enabled us to embark web-based learning approaches. The traditional web-based learning en...

Download PDF file
  • EP ID EP123227
  • DOI 10.14569/IJACSA.2016.070608
  • Views 95
  • Downloads 0

How To Cite

Kawish Bakht, Farhan Aslam, Tahir Nawaz, Bakhtawar Seerat (2016). LNG Import Contract in the perspective of Associated Technical and Managerial Challenges for the Distribution Companies of Pakistan. International Journal of Advanced Computer Science & Applications, 7(6), 66-74. https://europub.co.uk/articles/-A-123227