Maintenance Strategy Optimization of Urban Rail Transit OCS Based on Intelligent Operation and Maintenance
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 9
Abstract
Objective With the development of the intelligence technology and the building of intelligent operation and maintenance platform for urban rail transit overhead catenary/collector system (OCS), the operation and maintenance method of OCS is gradually transiting to prevention-oriented status repair. Therefore, the maintenance strategy needs to be optimized correspondingly. Method The status data of OCS parts and components are the basis to realize intelligent operation and maintenance. The classification, collection and treatment methods of the above data are introduced. The optimized content of the maintenance strategy under the condition of intelligent operation and maintenance platform building is described. Result & Conclusion Though the intelligent operation and maintenance platform of OCS system can give suggestion on maintenance decision according to the OCS status evaluation results and failure induction, concrete maintenance plans need be optimized in combination with the experience of the maintenance personnel. Therefore, it is necessary to attach great importance to the status inspection of OCS parts and components under sudden, abnormal and unforeseeable events, and strengthen intelligent control of OCS maintenance operation as well.
Authors and Affiliations
Delong GUO
Discussion on Integrated Supervisory Control System 2.0 for Urban Rail Transit
[Objective] In order to solve the deficiencies of the traditional integrated supervision and control system (ISCS) of urban rail transit, such as outdated system architecture, insufficient system integration and complex...
Cause Analysis of Seepage Disaster in Deep Foundation Pit of Metro Station in Karst Stratum
Objective In-depth study should be made on the seepage stability during deep foundation pit excavation in water-rich karst stratum in consideration of the water inrush disaster at the side wall or bottom of the pit durin...
Research on Accessibility Evaluation Method for Urban Rail Transit Station Based on Shared Bicycle Connection
[Objective] The shared bicycle is an effective connection tool for urban rail transit station. It is necessary to establish an accessibility measurement model to evaluate the accessibility of urban rail transit stations...
Asset Management Value Oriented Nanjing Metro Asset Information System Construction
[Objective] In the process of URT (urban rail transit) asset formation, there are challenges in the smooth transmission of asset information, leading to issues such as ′inconsistency between accounts and reality,′ diffic...
Influence of Large-scale Foundation Pit Sloping Excavation on Adjacent Operating Metro Tunnel and Actual Measurement Analysis
Objective There are complex coupling effects between foundation pit and tunnel due to different construction processes. The foundation pit construction will inevitably cause disturbance to the existing operation tunnel,...