Objective During the train commissioning and trial operation of Hangzhou Metro Line 1 Phase III section, abnormal occupancy (red-light band) appears in axle counter equipment at different positions along the line, significantly affecting metro operational safety. Therefore, it is necessary to carry out analysis and tests on abnormal interference scenarios, selecting appropriate improvement schemes to solve the abnormal occupation problem for axle counter equipment. Method The situation of abnormal interference and occupation during trains passing through the Phase III axle counting section is introduced. The relation between train traction equipment circuit return and axle counter equipment interference harmonics is analyzed, and relevant investigation, testing, and verification are conducted. Solutions for addressing the interference harmonics generated by the overlapping working frequency bands of train traction equipment and axle counter equipment are proposed. Result & Conclusion For the abnormal occupation (red-light band) situation during Line 1 Phase III project train passing through Phase III axle counting section, it is feasible to tackle the issue by optimizing train traction system equipment working frequency parameters. By shifting the working frequency band of train traction equipment away from that of the axle counter equipment, the issue of equipment co-frequency interference can be solved.

Authors and Affiliations

Gangwei JIN, Lingling DING, Qilei LI, Fei ZHENG

Keywords

Related Articles

Evaluation and Analysis of Energy-saving Type Energy Management System for Qingdao Metro Line 13

Objective The constructor of Qingdao Metro Line 13 has a higher requirement for energy saving during operation. In the process of construction, in order to implement the concept of energy saving, environmental protection...

Deformation and Crack Propagation Characteristics of Carbon Fiber Reinforced Concrete Shield Segments Based on Particle Discrete Element

Objective The Xiaozhuang Station-Wanshou Station interval shield tunnel is located in a highly fractured rock layer with developed groundwater, facing extremely complex geological conditions and requiring relatively high...

Design and Deployment Plan of Elastic Cluster Cloud Platform Architecture for Metro Passenger Flow Analysis Scenarios

[Objective] In the rapidly evolving landscape of digital technology, cloud computing is widely utilized in various industries including metro systems. To ensure passenger travel safety and achieve real-time acquisition a...

Assessment and Optimization Strategies of Tram Station Environment Based on Park City Scene Creation

Objective In the development context of ecological construction and new urbanization for park cities in the current new-era, the main theme is to explore the planning direction and influencing factors of urban new scene...

Experimental Investigation on Grouting Repair in Operational Shield Tunnels

Objective After a significant cross-sectional deformation of shield tunnel structure, using internal tension steel ring reinforcement and the like will incur substantial material and labor costs. Improving the stress con...

Download PDF file
  • EP ID EP742643
  • DOI 10.16037/j.1007-869x.2024.07.059
  • Views 31
  • Downloads 0

How To Cite

Gangwei JIN, Lingling DING, Qilei LI, Fei ZHENG (2024). Analysis and Solutions of Axle Counter Red-light Band Issues on Hangzhou Metro Line 1. Urban Mass Transit, 27(7), -. https://europub.co.uk/articles/-A-742643