Manajemen Pelaksanaan Pekerjaan Jalan Menggunakan Perkerasan Kaku (Rigid Pavement) Pada Proyek Jalan Tol Manado – Bitung Seksi 2 (Sta 14+000 – 15+000)

Journal Title: Rhapsodi Jurnal Studi Multidisiplin - Year 2023, Vol 1, Issue 1

Abstract

Rigid pavement is a road pavement consisting of a cement concrete plate as the foundation layer and the subbase layer on the subgrade. Because it uses concrete as its raw material, this type of pavement is also commonly referred to as a concrete road. In construction, the concrete slab is often called the foundation layer because of the possibility of a layer of asphalt concrete on it as a surface layer. The problem discussed in this report concerns the method of carrying out road works using rigid pavement on the Manado - Bitung toll road project section 2 Airmadidi - Danowudu (STA 14+000 - 15+000). Heap of soil with a thickness of 50cm and compacted to 30cm. If the results of the sandcone test are more than 90% then it can proceed to the next layer. The quality of concrete on lean concrete is Fc 10 class E with a thickness of 10 cm and on rigid pavement is Fs 45 with a thickness of 30cm. The heavy equipment used in the implementation of rigid pavement work includes: Bulldozers, Excavators, Dump Trucks, Vibro Rollers, Water Tanks, Mini Excavators and Slip Form Pavers

Authors and Affiliations

Gerell H. Tulungen, Nicholas W. J. Mandagi, Semmy S W Rumampuk, Jendry Masinambow, Jemmy Tumimomor

Keywords

Related Articles

Analisis Pengaruh Dimensi Kualitas Layanan Terhadap Kepuasan Mahasiswa Studi Kasus: Program Studi Farmasi UKIT

This research analyzes the factors that influence the service satisfaction of pharmacy students at Tomohon Christian University, Indonesia. This research aims: (1) To find out how much influence the dimensions of service...

Peranan Supervisi Pendidikan Dalam Rangka Meningkatkan Kualitas Pendidikan Di Indonesia

Educational supervision has a very urgent role to play in providing feedback to educators, helping them improve teaching methods, and ensuring that the curriculum used is relevant and effective. In addition, educational...

Hubungan Kualitas Pelayanan Terhadap Kepuasan Konsumen pada Laundry Time Talete di Kota Tomohon

This research aims to understand the elements that influence the motivation of construction workers and how these motivational factors impact their performance and overall productivity. The study discovered that several...

Konflik Bersenjata Israel Palestina Menurut Hukum Internasional

Relation between Israel and Palestina are still of international concern to this day. This conflict not only has a geopolitical impact in the middle east region, but also has other impacts in the economic, social and pol...

Kerja Sama Orang Tua Siswa dan PAUD Bukit Zaitun Walian Dua

God gives every parent a child to raise, guide, and train. By sending their children to PAUD facilities, parents ensure their children have educational opportunities. The aim of sending students to PAUD is for them to ga...

Download PDF file
  • EP ID EP740418
  • DOI -
  • Views 38
  • Downloads 1

How To Cite

Gerell H. Tulungen, Nicholas W. J. Mandagi, Semmy S W Rumampuk, Jendry Masinambow, Jemmy Tumimomor (2023). Manajemen Pelaksanaan Pekerjaan Jalan Menggunakan Perkerasan Kaku (Rigid Pavement) Pada Proyek Jalan Tol Manado – Bitung Seksi 2 (Sta 14+000 – 15+000). Rhapsodi Jurnal Studi Multidisiplin, 1(1), -. https://europub.co.uk/articles/-A-740418