Minimizing Rental Cost under Specified Rental Policy in Two Stage Open shop Scheduling Problem
Journal Title: International Journal of Engineering Sciences & Research Technology - Year 30, Vol 2, Issue 9
Abstract
This Paper is an attempt to study two stage open shop scheduling problem in which processing time of the jobs are given. The objective of the paper is to obtain an algorithm to minimize the rental cost of the machines in two stage open shop scheduling problem under specified rental policy. A numerical illustration is given to justify the proposed algorithm.
Authors and Affiliations
Deepak Gupta*
Determination of Suitable Growth Medium for Chlorella Minutissima
The present investigation was undertaken to check the best suitable medium for high biomass production rate of genus Chlorella minutissima. Preliminary investigations undertaken with three widely used media i.e. C...
Land use/Land cover Mapping of IGNP Command Area in Bikaner District
The pressures on the natural resources have tremendously increased over years by man’s greed for commercialization and livelihood of local people. Devoid of regeneration, population and wide scale tree felling depleted...
Content Based Image Retrieval: A Survey on the Start of Art
Evolution of Internet has lead to the rapid increase in tremendous amount of information in the form of text or other multimedia. It is quite obvious, due to such availability, storing, browsing, searching and ret...
DETECTING SYBIL ATTACK BASED ON RSS IN MOBILE AD HOC NETWORKS
Mobile Ad hoc Networks (MANETs) is an autonomous collection of mobile nodes that form a temporary network without any existing network infrastructure or central access point. Since MANETs require a unique, distinc...
Design of Multistoried R.C.C. Buildings with and without Shear Walls
From the past records of earthquake, there is increase in the demand of earthquake resisting building which can be fulfilled by providing the shear wall systems in the buildings. Static Analysis is performed for r...