Monte Carlo simulation of district heating system short-term operation in electricity markets

Journal Title: Energetika - Year 2017, Vol 0, Issue 0

Abstract

Energy generation in district heating (DH) systems is usually done in combined heat and power (CHP) units which can efficiently produce both useful heat and electric power. There can also exist heat only boilers, electric heaters, heat pumps and heat storage tanks. The coupling of heat and power generation in the CHP units and the possibility to store heat for later use makes the short-term operation scheduling of such systems quite challenging. Furthermore, big DH systems produce power that is sold in the electricity markets. This makes the operation scheduling problem even more complex as the uncertainty of the electricity prices in the markets should be considered. To make optimal decisions under uncertainty, various mathematical optimization tools were developed, such as stochastic programming and robust optimization. In this paper, an approach based on a Monte Carlo simulation is followed. Initially, a model of DH system short-term operation and power trading is mathematically formulated. Then, this model is used to run a Monte Carlo simulation for a case study system where the values of stochastic parameters are simulated using autoregressive models. Results demonstrate that simulation is fast, taking 300–400 runs to converge. A comparison of two system configurations shows that the use of heat storage increases the daily expected profit by 11%. Finally, the electricity price volatility in this case study is such that mainly two CHP units are operating for most of the time.

Authors and Affiliations

Ilias Dimoulkas, Mikael Amelin

Keywords

Related Articles

Development and optimization of fast ablative pyrolysis technology in Ukraine

The article contains the aggregated results of the development and optimization of laboratory installation for ablative fast pyrolysis performance with productivity 1–4 kg/hour on final products. The experimental data on...

Dielectric properties of alumina ceramics for fusion applications

The insulating materials for radio frequency (RF) windows and different antenna supports for heating systems and some diagnostics are still an unresolved issue in future fusion machines such as DEMO. Alumina ceramic (Al2...

Cybersecurity of critical infrastructures such as nuclear facilities

In the last years, cybersecurity has become a crucial essential element within the security framework of critical infrastructures such as process industry, railways, hospitals and also nuclear facilities. The types of th...

Study of approaches to incipient fault detection in power transformer by using dissolved gas analysis

To maintain the reliability of power transmission it is important to detect the incipient fault of power transformer as early as possible. If the fault of a power transformer is not detected promptly, it can evolve resul...

Appreciation of LEI researchers in NUTHOS-12 Conference

Lithuanian Energy Institute researchers working in the area of thermal-hydraulic and nuclear safety, in order to increase awareness, expand international contacts and share their knowledge, take part in different...

Download PDF file
  • EP ID EP260803
  • DOI 10.6001/energetika.v63i3.3560
  • Views 84
  • Downloads 0

How To Cite

Ilias Dimoulkas, Mikael Amelin (2017). Monte Carlo simulation of district heating system short-term operation in electricity markets. Energetika, 0(0), 93-104. https://europub.co.uk/articles/-A-260803