Design & Optimization of Equipment for Insertion of Tube Bundle of Heat Exchanger
Journal Title: International Journal of Modern Engineering Research (IJMER) - Year 2013, Vol 3, Issue 4
Abstract
Presently pressure vessel industries, manufacturing screw plug heat exchanger implements manual way for inserting tube bundle against shell. This manual way of inserting tube bundle inside shell involves challenges such as centrealignment of shell & tube bundle, manual pushing of tube bundle inside shell. This method of insertion may either leads to damage of inner cladding of shell or baffle of tube bundle. Rather than this, manual method of tube bundle insertion needs more labors & more time is needed to complete the entire activity. This article proposes semi-automatic equipment which makes tube bundle insertion process more safe & reliable. Using this equipment around 90% time saving can be achieved for tube bundle insertion activity with reduced numbers of labors as well.
Authors and Affiliations
Kantilal P. Patil
Optimization of Corynebacterium glutamicum Immobilization on Alginate and Investigation into its Storage Conditions
The parameters of the immobilized process of Corynebacterium glutamicum VTCC – B – 0632 on alginate were identified by Plackett-Burman matrix, and the experiments were designed by response surface methodology h...
Life Cycle Assessment in a Cold Rolling Mill Manufacturing Industry in India-A Review
The life cycle phases of rolls of cold rolling mill consist of extraction of raw material, manufacturing, use and recycling. During each phase of life it consumes several inputs in the form of resources like energy, mate...
Modeling, Simulation And Implementation Of Adaptive Optical System For Laser Jitter Correction
Adaptive Optical System (AOS) for correction of beam jitter in a high power laser source is described. The jitter in a high power laser may results from platform vibrations and dynamically varying in-homogeneities in the...
Trough External Service Management Improve Quality & Productivity
The challenges in Small car project, necessitated improvements in quality and productivity, right from day one of implementation of project. Detailed studies on external management services, manufacturing proce...
Improvement of Plant Layout by using 5S technique-An industrial case study
5S is one of the most widely adopted techniques from the lean manufacturing toolbox. Along with Standard Work and Total Productive Maintenance, 5S is considered a "foundational" lean concept, as it establishes the operat...