NEURAL NETWORK MODELING IN PROBLEMS OF ELECTRICAL GRIDS MODES PREDICTION
Journal Title: Електротехніка і Електромеханіка - Year 2016, Vol 0, Issue 1
Abstract
Purpose. Forming a neuro-fuzzy network based on temperature monitoring of overhead transmission line for the prediction modes of the electrical network. Methodology. To predict the load capacity of the overhead line architecture provides the use of neuro-fuzzy network based on temperature monitoring of overhead line. The proposed neuro-fuzzy network has a four-layer architecture with direct transmission of information. To create a full mesh network architecture based on hybrid neural elements with power estimation accuracy of the following two stages of the procedure: - in the first stage a core network (without power estimation accuracy) is generated; - in the second stage architecture and network parameters are fixed obtained during the first stage, and it is added to the block estimation accuracy, the input signals which are all input, internal and output signals of the core network, as well as additional input signals. Results. Formed neuro-fuzzy network based on temperature monitoring of overhead line. Originality. A distinctive feature of the proposed network is the ability to process information specified in the different scales of measurement, and high performance for prediction modes mains. Practical value. The monitoring system will become a tool parameter is measuring the temperature of the wire, which will, based on a retrospective analysis of the accumulated information on the parameters to predict the thermal resistance of the HV line and as a result carry out the calculation of load capacity in real time.
Authors and Affiliations
A. N. Moroz, N. M. Cheremisin, V. V. Cherkashina, A. V. Kholod
LOW VOLTAGE NETWORKS INSULATION MONITORING WITH TWO AND THREE VOLTMETER READOUTS METHODS
Purpose. In the paper there are described methods of two and three voltmeter readouts for insulation resistance periodic measurement in live DC and AC/DC IT networks. A new measuring method for AC/DC networks is proposed...
PLANT «YUZHCABLE WORKS»: MILESTONES OF THE ROAD (75TH ANNIVERSARY OF THE PLANT «YUZHCABLE WORKS»)
With the history of the creation and development of the Plant «Yuzhcable works», the formation of the national cable industry is connected. The enterprise is the flagship of the industry. Its production potential and the...
ANALYSIS AND DEVELOPMENT OF THE BUBBLE MODEL OF THE FORMATION STAGE OF HIGH-VOLTAGE BREAKDOWN OF THE WATER GAP
Purpose. A high-voltage underwater electric explosion, realized by discharging a capacitor into a water gap, is characterized by three main stages: the stage of formation of the plasma channel, the channel stage and post...
COMPUTER SIMULATION OF INTERMITTENT CURRENT MODE OF DC ELECTRIC DRIVE WITH THREE-PHASE CONTROLLED RECTIFIER
Introduction. The mode of intermittent current for DC motor with three-phase thyristor rectifier appears in the idle intervals of some mechanisms. Active and passive filters reduce the variable component of the rectified...
EXPERIMENTAL STUDY OF PROCESSES IN AN ATTRACTIVE-SCREEN INDUCTOR SYSTEM UNDER ADDITIONAL COIL INSERTION
The article is devoted to experimental investigations of action of an additional coil inserted inside an inductor system with an attractive screen on induced current distribution in the work-piece and to determination of...