NOT IN-SERVICE RAILWAY ARCHED BRIDGES AND THEIR FUTURE

Journal Title: Civil and Environmental Engineering Reports - Year 2015, Vol 2, Issue 17

Abstract

At the turn of the 19th and 20th century, on the areas of nowadays northern and western Poland, the railway infrastructure was developing rapidly. In the late 80’s of the previous century many of the railway lines, together with the whole infrastructure including bridges, were being closed down. The example of such practices can be the brick bridge located near Nojewo, Voivodeship wielkopolskie. This article presents the technical parameters of these bridges and their damages as well as ideas for the future development of the railway facilities.

Authors and Affiliations

Artur JUSZCZYK, Marek DANKOWSKI, Adam WYSOKOWSKI

Keywords

Related Articles

Microbiology of acid waters ans ferruginous precipitates formation in the polish part of the Muskau Arch - preliminary raport

This work presents preliminary results of mineralogical, geochemical and microbiological investigations carried out in the Polish part of the Muskau Arch. As a result of sulphide oxidation in this abandoned mining area,...

24-HOURS VARIATION OF AMOUNT AND CONTENTS OF WASTEWATER FLOWING TO TREATMENT PLANT IN ZIELONA GÓRA

The article describes daily variations of influents in the aspect of their volume and composition in the sewage treatment plant of Zielona Gora. With a method of direct measurements the flow rate and the concentration of...

Limit analysis of steel-concrete composite structures with slip

The paper proposes a modeling of the load carrying capacity of steel-concrete composite structures with slip. An analytical approach to the load carrying capacity calculation of multilayered composite elements and struct...

AIDED PHYTOSTABILIZATION OF COPPER CONTAMINATED SOILS WITH L. PERENNE AND MINERAL SORBENTS AS SOIL AMENDMENTS

The present study was designed to assess phytostabilization strategies for the treatment of soil co-contaminated by increasing levels of copper with the application mineral amendments (chalcedonite, zeolite, dolomite). F...

SELECTED PROBLEMS OF APPLYING THE LAW IN ADAPTATION AND MODERNIZATION OF BUILDINGS IN POLAND

Chosen problems of law implementation in the contemporary process of building’s modernization in Poland. One of the major problems in the contemporary process of building’s modernization in Poland is the pluralism of dif...

Download PDF file
  • EP ID EP239712
  • DOI -
  • Views 60
  • Downloads 0

How To Cite

Artur JUSZCZYK, Marek DANKOWSKI, Adam WYSOKOWSKI (2015). NOT IN-SERVICE RAILWAY ARCHED BRIDGES AND THEIR FUTURE. Civil and Environmental Engineering Reports, 2(17), 51-60. https://europub.co.uk/articles/-A-239712