Novel Scheduling Policy for Delay Analysis of Multi-Hop Wireless Networks

Journal Title: GRD Journal for Engineering - Year 2016, Vol 1, Issue 11

Abstract

To maximizes the throughput performance of the systems, the scheduling algorithm which is widely used in multi-hop wireless networks and high speed switches need wide range of study. Various studies have subsequently focused on the design of simpler and faster scheduling algorithms which provide performance guarantee on the throughput. Recent results of this, highlights the deficiencies which are arisen due to all these scheduling systems mainly based on throughput. Moreover the development of analytical techniques to study the delay performance of such systems has to provide more focus to maintain the QOS, network design (choice of buffer size, capacity of links) etc. Analyzing the delay performance of multi-hop systems which follow throughput optimal scheduling policies are very difficult due to complex relationship between arrival, service and queue length processes. In this paper, I develop novel techniques for performance analysis of wireless networks and also design novel scheduling policies that are delay-efficient.

Authors and Affiliations

Reena Mol V. U

Keywords

Related Articles

Fabrication and Analysis of Go-Kart Frame and Steering

The report covers all the aspects of the designing and analysis of the final go-kart chassis design. It also covers the material used and the reason of using the material in the go-kart chassis. Apart from this we will a...

Process Modelling and Validation of LNG Re-Liquefaction

During transportation, there will be vaporization of LNG producing boil-off gas (BOG) and its re-liquefaction is required considering that large volume of BOG to be vented out. A cryogenic refrigeration cycle is utilized...

Fracture of Bone-Like Microstructure under Three-Point Bending Test

Composite materials with staggered structure show exceptional mechanical properties despite its brittle and weak building blocks. For instance, the fundamental structure of bone and bone-like materials is a staggered arr...

Design, Analysis and Optimization of Non Standard Weld Neck Body Flange in Small Pressure Vessel

Pressure vessels are leak proof containers, as the name implies, their main purpose is to contain a given medium under pressure and temperature. Pressure vessels are commonly used in industry to carry both liquid and gas...

Recovery of Furfural by using Membrane Technology

India has agro-based economy and agriculture accounts for a large share of GDP and employment. Besides, a number of useful products, a large quantity of agro-wastes are also produced which is not properly used at present...

Download PDF file
  • EP ID EP219804
  • DOI -
  • Views 102
  • Downloads 0

How To Cite

Reena Mol V. U (2016). Novel Scheduling Policy for Delay Analysis of Multi-Hop Wireless Networks. GRD Journal for Engineering, 1(11), 14-20. https://europub.co.uk/articles/-A-219804