Process Modelling and Validation of LNG Re-Liquefaction

Journal Title: GRD Journal for Engineering - Year 2018, Vol 3, Issue 2

Abstract

During transportation, there will be vaporization of LNG producing boil-off gas (BOG) and its re-liquefaction is required considering that large volume of BOG to be vented out. A cryogenic refrigeration cycle is utilized in order to re-liquefy the BOG and returns it to the cargo tank. Kapitza and claude are the usually used LNG re-liquefaction cycles. The developments in the processes adopted for the liquefaction of LNG boil-off will be addressed. Detailed study about the practical cycle like kapitza and claude cycle are performed. The experimental values of these re-liquefaction cycles at each state point are available. ASPEN HYSYS software is used to model these re-liquefaction cycles. Validating the ASPEN software result with experimental values and finding the error in the values of temperature and pressure at each state point. From this validation process it is found that simulation result using ASPEN software has very good agreement with experimental values.

Authors and Affiliations

Majo Davis, Ben Austin B Alapatt, Sreekanth Sarma P. V. , Aravind M, Kiran Mukund

Keywords

Related Articles

Region growth based segmentation to improve the porosity of Cu - (5–20%) W composite preforms

While preparing the composite preform in the powder metallurgy Lab, the various defects due to porosity, open crack and residual stresses are possible. This may lead to poor life and strength of materials. It is difficul...

Biometrics Based Time Attendance System using Face Recognition Algorithm

Face Recognition begins with extracting the coordinates of features such as width of mouth, width of eyes, pupil, and compare the result with the measurements stored inthe database and return the closest record (facial m...

Recent Study on the Behaviour of CFG Pile, DM (Deep Mixing) Column and Stone Columns Ground Improvement Technology

In recent years, in ground improvement technique, such as deep mixing (DM) column, Stone Colum (SC), vibro-concrete columns, geosynthetic-reinforced embedded stone columns and CFG Pile, have been more and more used to su...

Optimization of Cylindrical Grinding Machine Parameters for Minimum Surface Roughness and Maximum MRR

Cylindrical grinding is very important process to improve quality of the component and to get precision dimensions with smooth surface finish. In the manufacturing sector, producing smooth surface finish plays an importa...

Process Modelling and Validation of LNG Re-Liquefaction

During transportation, there will be vaporization of LNG producing boil-off gas (BOG) and its re-liquefaction is required considering that large volume of BOG to be vented out. A cryogenic refrigeration cycle is utilized...

Download PDF file
  • EP ID EP291527
  • DOI -
  • Views 83
  • Downloads 0

How To Cite

Majo Davis, Ben Austin B Alapatt, Sreekanth Sarma P. V. , Aravind M, Kiran Mukund (2018). Process Modelling and Validation of LNG Re-Liquefaction. GRD Journal for Engineering, 3(2), 32-36. https://europub.co.uk/articles/-A-291527