On Two Stage Open Shop Scheduling in Which Processing Time, Set Up Time Associated with Probabilities Including Job Block Criteria

Abstract

The present paper is an attempt through heuristic method to obtain the optimal sequence for n jobs two stage open shop problem in which Set up time separated from processing times, each associated with respective probabilities Including job block criteria.. The algorithm developed in this paper is very simple and easy to understand. A numerical illustration to clarify the algorithm is also given.

Authors and Affiliations

Deepak Gupta

Keywords

Related Articles

 TRANSIENT PROCESSES IN GROUPS OF CURRENT TRANSFORMERS FOR RELAY PROTECTION

 This paper presents methods of mathematical modeling of electromagnetic processes in groups of current transformers for protection, and excluding the calculation of the electrical connection with the presentation...

 Survey of Acknowledgement based Vector Routing for Opportunistic Networks

 Opportunistic networks are one of the most challenging area of interest MANETs. Here nodes communicate with each other when they get opportunity because path joining two mobile nodes never exists. Again nodes do...

 microRNA mRNA Module Prediction Leading to Microarray Data Analysis to Develop Gene Regulatory Network

 microRNAs (miRNAs) are those small RNAs that not only recognize but also regulate mRNA target genes. Evidences are relevant enough to show that they are key regulators for various functions including development a...

 Surge Detection System for Centrifugal Compressor

 Problem: The turbo compressor Surge is an unstable operating mode of compression system that occurs at mass flows below the so-called surge line. The instability is characterized by large limit cycle oscillations...

 COST REDUCTION IN COLOR CHANGING LED LAMP BY ADOPTION OF ANALOG CIRCUIT BY ADOPTION OF ANALOG CIRCUIT

 The consumers are gradually shifting to LED lamps from the traditional incandescent and CFL lamps as the LED lamps not only are more efficient than the conventional light sources but their lifetime is also more.Wi...

Download PDF file
  • EP ID EP106434
  • DOI -
  • Views 51
  • Downloads 0

How To Cite

Deepak Gupta (30). On Two Stage Open Shop Scheduling in Which Processing Time, Set Up Time Associated with Probabilities Including Job Block Criteria. International Journal of Engineering Sciences & Research Technology, 2(9), 2065-2069. https://europub.co.uk/articles/-A-106434