Operation Scheme for City Railway Train Considering Passenger Travel Time Value
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 3
Abstract
[Objective] In view of the functional orientation of city railway and the inconsistency in passengers demand for travel convenience, ride comfort, and economy under the current economic and social development, it is necessary to study the train operation scheme for city railway which takes the passenger travel time value into account. [Method] A train operation scheme model considering passenger travel time value is built. In the model, passenger travel cost and train operation cost are taken as the objective function, and train capacity, inter-station passenger flow and the operating train quantity are the main constraint conditions. Meanwhile, Pareto model is used to standardize the time value of various passengers and the operating cost of trains with different marshalling. Targeting the Shanghai urban rail transit airport link as the research background, two types of train marshalling for 4-car and 8-car trains are considered to calculate, analyze and evaluate the train operation scheme for the single trip during peak hours from Hongqiao Railway Station to Shanghai East Station. [Result & Conclusion] The train operation scheme which takes the passenger travel time value into account can minimize the passenger travel cost and better meet the time demands of various passengers. Extending the travel time for passengers with lower time value and shortening the travel time for passengers with higher time value can effectively achieve the economic efficiency of the train operation scheme.
Authors and Affiliations
Jin LUO, Haiyan ZHU, Zhigang LIU, Weijie Dai
Interchange Renovation Construction Technology of Beijing Subway Line 10 Xitucheng Station
Objective Taking the interchange renovation construction of Beijing Subway Line 10 Xitucheng Station as example, the construction scheme for interchange renovation in existing station without reserved transfer conditions...
Signaling System Renovation Plan for Suzhou Rail Transit Line 3 and Line 11 Through Train Operation
Objective To facilitate the integration of passenger flow between Suzhou and Shanghai, Suzhou Rail Transit Line 3 and Line 11 are connected at Weiting Station, where passengers currently transfer via the concourse within...
Analysis and Implications of Tram Line Network Planning Characteristics in Brunswick, Germany
[Objective] Tram network is the only urban rail transit system in Brunswick, Germany, serving as the backbone of the city′s public transportation system. Summarizing the key features of the expansion project planning pha...
Exploration and Practice of Nanjing Metro Digital Transformation
[Objective] Digital transformation is an inevitable trend for urban rail transit enterprises during the shift from high-speed growth to high-quality development. It is necessary to study the top-level design, path select...
Automatic Identification and Early-warning System for On-board Rail Corrugation Based on Image Processing Technology
[Objective] Current daily metro track inspections, including manual detection and track inspection vehicle method, suffer from issues such as low efficiency and high costs, failing to meet the increasing demands for rail...