Abstract

This paper describes a power plant with electrical/thermal capacity of 750 kW/3.4 MW launched in February 2015 by a private investor in Żory, Poland. The ORC Organic Rankine Cycle technology used there enables turbine operation at a lower temperature of the heat medium (thermal oil), so the energy transformation is better suited for biomass combustion. In addition, an innovative solution has been applied, consisting in directing the thermal oil downstream of the turbine to a heat receiver (dryer), instead of a cooling tower, as in traditional solutions. Such a solution significantly improves the CHP plant’s overall efficiency, but it also affects its electric output adjustability. The paper also reports the experience from the plant design and construction phases.

Authors and Affiliations

Grzegorz Błajszczak, Iwona Gaweł

Keywords

Related Articles

Influence of Power Converters on Increasing the Share of Renewable Energy Sources

The article shows various configurations of the topology of grid converters with their control systems, tailored to the needs of the energy market and regulations. Power electronic systems are used for the integration of...

Analysis of Technical Possibilities of Photovoltaic and Wind Sources Playing in an Ancillary Service of Frequency and Power Regulation

Together with a growing share of renewable energy sources (RES) in the generation sector of power systems, the interest of power grid operators in the possibilities of their use for regulation purposes is growing. The po...

e-Highway 2050: Methodology of Data Contextualization for the Purpose of Scenario Building

The e-Highway 2050 project is co-financed by the EU Seventh Framework Programme and is aimed at developing a methodology to support the long-term planning of the Pan-European Transmission Network, focusing on year 2050,...

Influence of Power System on Operation of an HVDC Link. A Case Study

An HVDC link enables power and energy exchange between unsynchronised power grids. Large possibilities of controlling active power flows through such systems enable commercial transfers, as well as emergency power balanc...

Determination of Connection Capacity in the HV Closed Network by the use of a Black-box Optimization – a Case Study

The current legislation imposes an obligation on power system operators to regularly determine and publish connection capacities of transmission and distribution network nodes. Currently, the coherent node method is used...

Download PDF file
  • EP ID EP198608
  • DOI 10.12736/issn.2300-3022.2016303
  • Views 60
  • Downloads 0

How To Cite

Grzegorz Błajszczak, Iwona Gaweł (2016). Operational Parameters of Low Power ORC Biomass Plant. Acta Energetica, 28(3), 23-27. https://europub.co.uk/articles/-A-198608