Optimization of Urban Rail Transit Signaling System Functions Based on Alternate Day Depot Return Operation Mode
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 11
Abstract
Objective In the alternate day depot return operation mode, trains either stay overnight on the mainline or run continuously day and night. The relevant functions of existing urban rail transit signaling system can no longer meet the requirements, therefore needing an optimization. Method Starting with an analysis of the functional optimization needs of signaling system, the optimization scenarios and contents for the on-board ATC (automatic train control) subsystem, the trackside ATC subsystem, the ATS (automatic train supervision) subsystem, and the signaling equipment self-inspection/monitoring are elaborated in detail. Result & Conclusion For the alternate day depot return operation mode, the on-board ATC subsystem is enhanced with train position memory function, allowing overnight trains on the mainline to start directly upon powered on in the controlled mode of signaling system. By adjusting buffer zone settings, the convergence protection envelope is optimized for non-communication trains staying overnight on the mainline, to avoid impacting the operation of other mainline trains. The optimized ATS subsystem supports both the automatic schedule matching after online timetable changes and the cross-day operation schedules. The functional optimization of signaling equipment self-inspection work enables the extension of signaling system equipment self-inspection or reboot cycle, meeting the requirements for long-term continuous operation. The series of signaling system functional optimizations enhance the availability of signaling systems and improve the service levels.
Authors and Affiliations
Juan CHAI
Sensitivity Analysis of Design Parameters for Suspended Monorail Single-ribbed Arch Bridge
[Objective] As there are few case studies on suspended monorail single-ribbed arch bridge, it is necessary to analyze the sensitivity of different design parameters to better instruct the design and construction of the b...
Cause Analysis and Improvement Measures for Maglev Train Brake Release Failure in Beijing Subway Line S1
Objective The maglev train of Beijing Subway Line S1 had a brake release failure during operation, impacting line normal operation. Therefore, it is necessary to find out the exact cause of the fault and put forward impr...
Onboard Active Obstacle Detection System for the Area Directly Related to Train Running and Its Application
Objective In order to solve the lag problem of current passive detection methods in detecting the obstacles in the area directly related to train running (hereinafter referred to as train running area or TRA), reserve mo...
Construction Methods and Mechanical Characteristics of Large Metro Stations in Expansive Soil Layers in Chengdu
Objective In parts of Chengdu, the underlying bedrock in expansive soil area is mudstone, providing a conducive space for groundwater accumulation. This leads to the swelling of expansive soil upon water absorption, caus...
Rail-to-ground Insulation Defect Diagnosis Method Based on Spatiotemporal Correlation of Rail Potential
Objective The data of various monitoring points regarding rail potential as monitoring object is correlated in time and space, and the direct manifestation of changes in rail-to-rebar structural resistance is reflected i...