Optimizing horizontal wells length of low permeability reservoir by fuzzy math
Journal Title: Scholars Journal of Engineering and Technology - Year 2014, Vol 2, Issue 5
Abstract
M69 block of Jilin province is low permeability reservoir which the choice of horizontal wells length is one of the essential problems to the oilfield development. In this paper, fuzzy evaluation method will be applied to optimize the horizontal length of horizontal wells considering layer permeability, pressure difference, fracture quantity, fracture half length, fracture width and fracture interval six factors comprehensively. The example indicates that the calculation is accurate with promotional value. Keywords: fuzzy math; horizontal wells; horizontal section length; low permeability
Authors and Affiliations
Liu Chengting, Yang Panpan, Zhang Dongyang, Meng Qi, Li Rui
Analyzing the Quality Management Process in Healthcare Sector
This paper is concerning the quality management in the two different private Erbil hospitals. The reason behind choosing this topic and those two different private hospitals is that they both are in same environment of p...
Case Study of Earthworks Management on Hu-Shan Reservoir
Present study investigated the earthworks (storage and transportation) management on large scale project (Hu-Shan reservoir) performance (cost and time). After apply the planning structure which developed in present stud...
A Review on Compressive and Tensile Strength of Concrete Containing Rice Husk Ash and Coir Fiber
Cement manufacturing industry is one of the carbon dioxide emitting sources besides deforestation and burning of fossil fuels. The global warming is caused by the emission of green house gases, such as CO2, to the atmosp...
The Frequency Characteristics of the Receiving Piezoceramic Transducer with Coordinating Layer
The problem of the sound reception by means of cylindrical transducer in the circular layer is considered in "through" formulation. Electroelastic properties of piezoceramic shell and the transition layer was taken into...
Measurement of Productivity Using Work Sampling Method at MenaraSentrayabuilding Project Jakarta Indonesia
Abstract:Costruction management should be able to know some ways to measure workers productivity before making an effort to improve productivity. Productivity is one of the most important issues in both developed and de...