Planning, Scheduling and Delay Analysis of Construction Project

Abstract

Construction planning and scheduling is an important tool in a construction project. In every construction project a lot of activities are involved which need to be planned and scheduled properly to ensure the successful completion of the project. Therefore the study on construction planning and scheduling is important so as to provide a view on how it is to be implemented on construction project. This paper consists of study on the concept of planning and scheduling of various activities associated with building construction project. Also study of project management software (MSP) is done. To find out total project duration and critical path planning and scheduling technique is to be used. From the results of planning and scheduling delays that occur in the project are analyzed. In the next step controlling technique is for optimization of the completion time of the project

Authors and Affiliations

Neeraj Kumar

Keywords

Related Articles

Prevalence and Detection of Amp C β- Lactamase Resistance in Gram Negative Uropathogens

The most common mechanism of resistance in Gram negative bacteria is by the production of ß lactamases which inactivate ß lactam antibiotics. Among which Amp C β lactamases are more important because they confer resistan...

Motivating Students Facing Science Education (Motivation des Elèves Face à l’Enseignement Scientifique)

This study focuses on the contribution that can have a job on the instructions in motivating students to scientific common trunk (TCS). The lack of student motivation is a problem frequently encountered in class. The cau...

Outlier Detection and Analysis using Hybrid Approach for Mixed datasets

There are several approaches of outlier detection employed in many study areas amongst which distance based and density based outlier detection techniques have gathered most attention of researchers.So we are using hybri...

Performance Evaluation of Continuous Reinforced Concrete Pavement

Performance is key factor for selection of pavement type. In the present study performance evaluation on four Continuous Reinforced Concrete Pavement (CRCP) projects have been carried out by actual site survey. For perfo...

Biodiesel: A Most Feasible Option Produced from Microalgae over Petro-Diesel

ue to continuous use of present source(fossil fuel) mainly cause the pollution to the environment and also negative effect on availability of the oil reservoirs necessitates developing renewable fuels to rep...

Download PDF file
  • EP ID EP240994
  • DOI -
  • Views 109
  • Downloads 0

How To Cite

Neeraj Kumar (2015). Planning, Scheduling and Delay Analysis of Construction Project. International journal of Emerging Trends in Science and Technology, 2(6), 2565-2568. https://europub.co.uk/articles/-A-240994