Planning the Operation of a Hybrid Generation System in the Power System in a Multi-faceted Approach

Journal Title: Acta Energetica - Year 2017, Vol 30, Issue 1

Abstract

The paper presents the results of a multi-criteria analysis of the cooperation of a hybrid generation system (HGS) with the power system. The analysed system consists of wind turbines, photovoltaic panels and an energy storage cell – a PEM fuel cell. The paper defines and describes the decision criteria of cooperation, taking into account energy-related, economic and environmental aspects. Results of analyses carried out for two consumer energy profiles are included. The impact of the weight of adopted decision criteria on the final result of the multi-criteria analysis was analysed.

Authors and Affiliations

Bartosz Ceran, Krzysztof Sroka

Keywords

Related Articles

Electricity Distribution Effectiveness

This paper discusses the basic concepts of cost accounting in the power industry and selected ways of assessing the effectiveness of electricity distribution. The results of effectiveness analysis of MV/LV distribution t...

Testing Situation Awareness Network for the Electrical Power Infrastructure

The contemporary electrical power infrastructure is exposed to new types of threats. The cause of such threats is related to the large number of new vulnerabilities and architectural weaknesses introduced by the extensiv...

Planning the Operation of a Hybrid Generation System in the Power System in a Multi-faceted Approach

The paper presents the results of a multi-criteria analysis of the cooperation of a hybrid generation system (HGS) with the power system. The analysed system consists of wind turbines, photovoltaic panels and an energy s...

Problems of Selecting Protection for Shunt Reactors Working in Extra-High Voltage Grids

This paper presents difficulties encountered when designing protection devices for shunt reactors connected directly to extra-high voltage grids. Using the example of the 400 kV Ełk Bis substation, it has been demonstrat...

Problems of Connecting Wind Farms to the Power System with HV Cables

This paper presents problems caused by connecting wind farms to a power system with high voltage cables. The author highlights possible problems with reactive power compensation, depending on the arrangement of the shunt...

Download PDF file
  • EP ID EP197986
  • DOI 10.12736/issn.2300-3022.2017101
  • Views 64
  • Downloads 0

How To Cite

Bartosz Ceran, Krzysztof Sroka (2017). Planning the Operation of a Hybrid Generation System in the Power System in a Multi-faceted Approach. Acta Energetica, 30(1), 4-9. https://europub.co.uk/articles/-A-197986