Problems of Connecting Wind Farms to the Power System with HV Cables

Journal Title: Acta Energetica - Year 2016, Vol 27, Issue 2

Abstract

This paper presents problems caused by connecting wind farms to a power system with high voltage cables. The author highlights possible problems with reactive power compensation, depending on the arrangement of the shunt reactor connection and settings of control systems for reactive power and voltage of the wind farm. The paper also discusses issues of increasing active power losses caused by a shunt reactor installation.

Authors and Affiliations

Jacek Klucznik

Keywords

Related Articles

Hardware-Software Implementation of Basic Principles Simulator of Nuclear Reactor Processes

The paper presents implementation process of basic principle simulators of a nuclear reactor processes. Simulators are based on point-models of processes: kinetics of neutrons, heat generation and exchange, poisoning and...

Planning the Operation of a Hybrid Generation System in the Power System in a Multi-faceted Approach

The paper presents the results of a multi-criteria analysis of the cooperation of a hybrid generation system (HGS) with the power system. The analysed system consists of wind turbines, photovoltaic panels and an energy s...

Balancing the Unbalanced Supply of Generation Sources – Additional Costs in a Competitive Energy Market

Trade balancing of balancing mechanism units entails additional costs of electricity purchases for consumers’ own needs. Trading companies constantly look for effective tools to reduce the costs of their operations in th...

Improving Power Quality in AC Supply Grids

This paper describes a digital and actual model of the UPQC (Unified Power Quality Conditioner) integrated system for power quality improvement. The UPQC’s design and its connection to an AC supply grid, 1-phase and 3-ph...

GIS and AMI Systems as Sources of Data to Improve Grid Operation Efficiency, the Results of a Pilot Study

New Smart Grid technologies allow increasing grid observability and using data for the implementation of new analytical tools. By integrating the available data, the grid management paradigm can be changed, and grid effe...

Download PDF file
  • EP ID EP199620
  • DOI 10.12736/issn.2300-3022.2016210
  • Views 50
  • Downloads 0

How To Cite

Jacek Klucznik (2016). Problems of Connecting Wind Farms to the Power System with HV Cables. Acta Energetica, 27(2), 118-122. https://europub.co.uk/articles/-A-199620