Abstract
Objective With the increasing demand for passenger comfort in urban rail transit, pressure wave control inside metro trains at speed of 120 km/h and above has become a an essential function of train air-conditioning system. Although high-speed EMUs and 160 km/h city railway trains already have mature pressure wave protection devices, most of them use pneumatic methods, complex in structure and relatively costly, therefore unsuitable for metro vehicles. Therefore, it is necessary to study pressure wave protection schemes suitable for metro vehicles based on their characteristics. Method Sampling tests are conducted on the pressure wave dynamics inside existing metro trains with speed of 120 km/h. Based on the test results and factors such as the operating routes and station layout, the primary influencing factors causing pressure wave dynamics inside the train are summarized, and a scheme using electric fresh air valves in the air conditioning system to control pressure wave dynamics inside the train is proposed. Validation of pressure waves inside the train is conducted under different opening degrees of the fresh air valve. Result & Conclusion Experimental results demonstrate that metro vehicles can utilize favorable factors such as fixed routes, fixed stations, and fixed dwell time to adopt an active pressure wave control scheme. The air-conditioning system controls the opening and closing of fresh air valves by using station information through the train network and speed signals, thereby controlling pressure wave dynamics inside the train. This scheme is relatively simple in structure, low in cost, and flexible in control compared to high-speed EMUs and 160 km/h city railway trains.
Authors and Affiliations
Xuwei FENG, Jun ZHAO, Yuan CHEN, Guanglu YU
Deformation Characteristics of Large Section Tunnel Surrounding Rock and Optimization of Tunnel Construction Scheme for Qingdao Metro Line
Objective The large section tunnel, due to flat shape and large span, usually adopts multiple steps and staged excavation. In the process of construction, the surrounding rock and the temporary support are repeatedly dis...
Research and Application of Train Communication Network Based on Time-sensitive Networking
Objective TCN (train communication networks) has complex topologies and requires high real-time transmission capabilities. Currently, train data transmission mainly relies on TRDP (train real-time data protocol) for carr...
In-depth Security Defense Strategy for Rail Transit Vehicle Communication Network System
Objective The vehicle communication network contains a wide variety and a large quantity of internal and external network communication interfaces, resulting in continuous rising of the vehicle information security risks...
Optimal Algorithm of Tram Section Energy-saving Speed Curve under Fixed Time Constraint
Objective Calculation of tram operation control scheme taking into account energy consumption requires a great deal of calculation of the energy-saving speed profile. In order to establish an accurate and efficient optim...
Impact of Small Clearance Bored Pile Construction under Rail Transit Bridges in Soft Soil Area