Quality engineering tools in analysis of failure of longwall mining complex

Journal Title: Mining – Informatics, Automation and Electrical Engineering - Year 2018, Vol 535, Issue 3

Abstract

Downtimes caused by machine failures translate into a loss of effectiveness in the mining process. The main task of maintenance teams in hard coal mines is to ensure the uninterrupted work of the machines used. A measurable effect of these activities should be reducing machine maintenance and, as a consequence, reducing the costs of coal mining; i.e., a mine's operating costs. In the present article, two longwall mining machines have been analyzed: a cutter-loader and a plow. The analysis was based on one of the quality engineering tools – the Pareto–Lorenz diagram. This tool allows for grouping the causes of breakdowns and establishing which of them are the most important and should be removed first. The analysis has demonstrated the significance of machine selection and its adjustment to the existing geological-mining conditions. Improper selection results in increased energy consumption in the mining process, premature wear, or prolonged downtimes caused by breakdowns.

Authors and Affiliations

Witold Biały, Patrycja Hąbek

Keywords

Related Articles

Coreless coil AC transducer

Today’s circuits of systems for monitoring electrical values as well as circuits of power system automation consume less and less power. This is an inspiration to search for state-of-the-art solutions of AC transducers [...

Computer system architecture for Polish-language documents search with the use of queries in a natural language

The article features an architecture concept of a system to search for information in text documents with the use of natural-language queries. The basic element of the proposed solution is the application of query expans...

Automatic compensation of reactive power with a system for monitoring a 6 kV electrical power grid in a mine

The paper features a concept, execution and results of a central system for automatic reactive power compensation of a 6 kV electrical power grid in a mine. The following were used as controlled compensators of reactive...

Introduction of standardization of powered roof supports to increase production efficiency of Polska Grupa Górnicza S.A.

The introduction of the standardization of a powered roof support is a key point in increasing production efficiency in the mines of Polska Grupa Górnicza S.A. The introduced changes will increase the safety of the miner...

Setting the range of reactive power regulation for a salient-poles motor based on the measurement of the synchronous work state

The article features a method of determining synchronous reactance in the axes d and q for a synchronous motor with salient poles based on measuring basic electrical quantities in the state of synchronous work. The admis...

Download PDF file
  • EP ID EP433764
  • DOI 10.7494/miag.2018.3.535.33
  • Views 154
  • Downloads 0

How To Cite

Witold Biały, Patrycja Hąbek (2018). Quality engineering tools in analysis of failure of longwall mining complex. Mining – Informatics, Automation and Electrical Engineering, 535(3), 33-39. https://europub.co.uk/articles/-A-433764