Reflections on Promoting Urban Rail Transit Sustainable Development in New Era
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 7
Abstract
Objective URT (urban rail transit) development in China is at the 'crossroad', requiring both seeking good strategies for gradually alleviating the financial pressure on the existing city construction and operation and facilitating effective support of URT providing for urban development. Hence, it is urgent to actively explore the effective path of URT high-quality and sustainable development in the new era. Method Five prominent problems in URT development are introduced, including the difficulty of land dividends feeding back into rail transit construction, and the failing of 'rail transit + comprehensive development' to meet expectations. Two major changes that promote URT development in the new era are analyzed. Five suggestions for promoting URT high-quality and sustainable development are put forward. Result & Conclusion URT is the public transportation development direction for modern large cities, and plays an important role in optimizing urban spatial layout and driving industrial upgrading. With the situation of promoting steady economic recovery and high-quality development, the construction of transportation infrastructure should be accelerated, and the investment in URT construction should be appropriately advanced, calling for a move onto a more sustainable development path through mode transformation and structure adjustment.
Authors and Affiliations
Juan LI, Xinquan OU
Research on the Impact of Wheel Polygonalization on Metro Bogies
Objective The objective is to investigate the impact of wheel polygonalization on metro bogies, thereby strengthening the control requirements for wheel polygonalization, and enhancing the operational quality and safety...
Characteristics and Applicability Analysis of Flexible Scheduling for Urban Rail Transit Crews
[Objective] In view of the situation that the flexible crew scheduling method commonly used in foreign metro systems is barely applied in China, the applicability of flexible scheduling in Chinese metro system and the ma...
Metro Station Platform Width Design Method and Influencing Factors Analysis Based on Simulation Tests
[Objective] The current design calculation methods for platform width suffer from issues such as low passenger flow prediction accuracy, broad range of passenger flow density parameter values, unclear selection criteria,...
Simplified Calculation Method for Existing Tunnel Settlement Caused by Shield Under-passing Based on Timoshenko-PasternakModel
Objective It is aimed to tackle the inefficient accuracy of traditional Euler-Bernoulli beam and Winkler foundation model in calculating settlement induced by shield under-passing existing tunnels. Method Based on the Ti...
Simulation Analysis of A Metro Station Construction in Shenzhen with Small TBM Advancing Excavation Followed by Large TBM Enlargement
[Objective] The new technique of small-diameter TBM (tunnel boring machine) advancing excavations followed by large-diameter TBM enlargement is used for the first time in the construction of Tumor Hospital Station on She...