Research of the manipulator dynamics installed on an elastic basis
Journal Title: Підводні технології - Year 2018, Vol 8, Issue
Abstract
In many scientific articles on construction topics, the problem of building density has re-cently been considered [1, 2]. When working construction equipment in the construction of such objects there is a problem of safety of work. For example, in work [3, 4] the possibil-ity of an excavator with an offset digging axis is presented. But, such research for construc-tion cranes and construction robots is not enough. The elasticity of metal structures of real me-chanical systems manipulators greatly affects their work [5]. When lifting cargo manipulator in its metal construction generated vibrations due to the complex dynamics of the machine. Fluctuations cargo the cause errors in its posi-tion and reduce life of the machine. For elimi-nate fluctuation make use of the dampers and devices regulate speed of the working body of the manipulator [5, 6].
Authors and Affiliations
Dmitriy Mishchuk
E.O.Paton Electric Welding Institute activity in the field of underwater welding and cutting
Presents the results of E.O.Paton Electric Welding Institute developments on creating electrode materials, equipment and technology for wet underwater welding and cutting. The R&D efforts in this area include investigati...
Ways of considering traditions when forming the system of maintenance in Ukraine
The size of the territory, the density of the city dwellers, the number of cars for personal use, planning conditions and network configuration of highways and roads are the main components that influence the placement f...
Achievements and prospects of development of the mechanized and automatic equipment for a underwater arc/w wet-process
The article deals with the current level of the main directions of development of mechanized and automatic equipment for arc-welding and wet cutting. Examples of real developments of semi-automatic machines and automatic...
Functioning of filter structures in changing velocity conditions over time
One of the main constructions, which are used for preparing water of necessary quality, is rap-id filter. Functioning of such structures, as a rule, takes place in free-flow regime. Structures operation time depends on t...
The reasons for architectural monuments destruction and methods of capacity reinforce for bases and fundaments
The main problem of monuments’ emergency state is poor condition of the bases and founda-tions often due to their moisture. Uneven foun-dations subsidence leads to redistribution of ef-forts in bearing constructions and...