RESOURCE OPTIMIZED SOFTWARE PROJECT SCHEDULING USING FUZZY RANDOMIZED PSO

Journal Title: IJAR-Indian Journal of Applied Research - Year 2017, Vol 7, Issue 7

Abstract

Projects Scheduling plays a significant role in software project management. Recently, a few research works has been designed for project scheduling and resource allocation. But, there is a need for effective scheduling model for scheduling multiple project activities with minimum cost. In order to overcome such limitation, Fuzzy Random Optimized Dynamic Mean PSO (FRODM-PSO) model is proposed to prioritize multiple project activities of multiple software projects. The FRODM-PSO model designed a Dynamic Mean Particle Swarm Optimization (DM-PSO) algorithm for prioritizing multiple projects’ activities with minimal scheduling time that assure minimum cost. In DM-PSO algorithm, the weight and learning factors are measured in an iterative manner with changes in the iteration level. At the same time, the DM-PSO algorithm selects the particle with best fitness value among the all particles as best solution for scheduling the multiple project activities therefore ensuring the memory optimization. With the prioritized multiple projects’ activities, a Fuzzy Random Optimization model towards multiple project scheduling using two levels of decision makers is designed for allocating the resources with higher resource optimization rate. The performance of FRODM-PSO model is measured in terms of scheduling time, memory usage and resource optimization rate. The experimental result shows that the FRODM-PSO model is able to improve the resource optimization rate by 17% and also reduces the scheduling time by 48% when compared to state-of-the-art-works.

Authors and Affiliations

I. K. GULAM MOHIDDIN

Keywords

Related Articles

Quality of Service Based Improved Dynamic Source Routing in MANETs

Offering theQuality of Service (QoS)guarantee in a Mobile Ad-hoc Network (MANET) is a complicatedowing to node mobility, disputation for channel access, limitation centralized coordination and unreliable wireless channel...

Review of Three Cases of Cortical Sinus Venous Thrombosis(CSVT).

Cortical venous thrombosis(CVT) is a rare cause of stroke in adults.Its varied presentstions make the c-lini cian to have strong degree of suspicion and investigate accordingly thus instituting early treatment.We present...

Isolation of pigmented bacteria for various applications

Use of microorganisms for obtaining various natural products has rapidly increased over last few years, as they are important source of many industrially important products. In the present study, pigmented bacteria were...

A STUDY TO ASSESS SOCIO-DEMOGRAPHIC PROFILE, JOB CHARACTERISTIC & SELF-REPORTED ILLNESS AMONG THE CONSTRUCTION WORKERS FROM RURAL PART OF CENTRAL INDIA.”

There is estimated 11.6 million workforce working as construction workers. The construction workers are more vulnerable to socio-economic distress and many health issues. The present study was conducted on the constructi...

ENTREPRENEURIAL TRAINING PROGRAMS IN HIGHER EDUCATIONAL INSTITUTES: A STUDY IN ASSAM UNIVERSITY

To boost the economy of a country the focus on entrepreneurship is very important. It is through entrepreneurship the economy expands and job creation increases. The Government of India has undertaken number of initiativ...

Download PDF file
  • EP ID EP459808
  • DOI -
  • Views 57
  • Downloads 0

How To Cite

I. K. GULAM MOHIDDIN (2017). RESOURCE OPTIMIZED SOFTWARE PROJECT SCHEDULING USING FUZZY RANDOMIZED PSO. IJAR-Indian Journal of Applied Research, 7(7), 29-34. https://europub.co.uk/articles/-A-459808