Retiming Of Fixed Point Digital Filter for Critical Path Reduction

Journal Title: International Journal of Engineering and Science Invention - Year 2018, Vol 7, Issue 5

Abstract

This Work Describes A Circuit Transformation Technique Called Retiming In Which Registers And Added At Some Points In A Circuit And Removed From Others In Such A Way That The Functional Behavior Of The Circuit As A Whole Is Preserved. We Show That Retiming Can Be Used To Transform A Given Synchronous Circuit Into A More Efficient Circuit Under A Variety Of Different Cost Criteria. We Model A Circuit As A Graph In Which The Vertex Set V Is A Collection Of Combinational Logic Elements And The Edge Set E Is The Set Of Interconnections Each Of Which May Pass Through Zero Or More Registers. We Employ Retiming To A Fixed Point Digital Filter To Reduce The Critical Path Delay.

Authors and Affiliations

Mohd. Shizan Sheikh, Prof. M. T. Hasan

Keywords

Related Articles

Assessment of Borehole Water Quality in OredoMunicipality

In Oredo municipality, households basically rely on groundwater sources as their only source of water to meet their ever-growing water demands and as such the need to study the quality of these sources of water arises. W...

Study And Analysis Of Hadoop Based Network Intrusion Detection System.

Network security is a paramount concern for the organization. To secure the network, we have traditional network intrusion detection systems and firewalls but they have limitations like size of training data sets .With t...

Influence Of pH And Temperature On The Activities Of AlphaAmylase In Maltodextrin Production From Breadfruit Starch

Maltodextrin is a starch-derived food additive used to add bulk and sweetness to packaged foods. The study was carried out toinvestigatethe influence of pH and temperature on the activities of alpha-amylase in maltodextr...

The Characteristics of Thermal Water and Their Impact in the Sustainable Development of Tourism in Dibër Area

The objective of this study has been the defining of the characteristics of thermal water in Peshkopi and their impact in the sustainable development of the area. The study has been carried out during years 2011-2013. Th...

Some Perfect Pythagorean Triangles Where Their Perimeters Are Quarternary Numbers

The main objective of this paper is to find the Special Pythagorean Triangles with one leg as perfect number and where their perimeters are quaternary numbers. Cases, when one leg and the hypotenuse are consecutive odd n...

Download PDF file
  • EP ID EP397286
  • DOI -
  • Views 70
  • Downloads 0

How To Cite

Mohd. Shizan Sheikh, Prof. M. T. Hasan (2018). Retiming Of Fixed Point Digital Filter for Critical Path Reduction. International Journal of Engineering and Science Invention, 7(5), 68-71. https://europub.co.uk/articles/-A-397286