Risk Management in Construction Project

Journal Title: International Journal of Engineering and Management Research - Year 2018, Vol 8, Issue 3

Abstract

Risks have a significant impact on a construction project’s performance in terms of cost, time and quality. As the size and complexity of the projects have increased, an ability to manage risks throughout the construction process has become a central element preventing unwanted consequences. How risks are shared between the project actors is to a large extent governed by the procurement option and the content of the related contract documents. Therefore, selecting an appropriate project procurement option is a key issue for project actors. The overall aim of this research is to increase the understanding of risk management in the different procurement options: design-bid-build contracts, designbuild contracts and collaborative form of partnering. Deeper understanding is expected to contribute to a more effective risk management and, therefore, a better project output and better value for both clients and contractors. The study involves nine construction projects recently performed in Sweden and comprises a questionnaire survey and a series of interviews with clients, contractors and consultants involved in these construction projects. The findings of this work show a lack of an iterative approach to risk management, which is a weakness in current procurement practices. This aspect must be addressed if the risk management process is to serve projects and, thus, their clients. The absence of systematic risk management is especially noted in the programme phase, where it arguably has the greatest potential impact. The production phase is where most interest and activity are to be found. As a matter of practice, the communication of risks between the actors simply does not work to the extent that it must if projects are to be delivered with certainty, irrespective of the form of procurement. A clear connection between the procurement option and risk management in construction projects has been found. Traditional design-bid-build contracts do not create opportunities for open discussion of project risks and joint risk management. A number of drivers of and obstacles to effective risk management have been explored in the study. Every actor’s involvement in dialogue, effective communication and information exchange, open attitudes and trustful relationship are the factors that support open discussion of project risks and, therefore, contribute to successful risk management. Based on the findings, a number of recommendations facilitating more effective risk management have been developed for the industry practitioners.

Authors and Affiliations

Keywords

Related Articles

A Literature Survey Different Algorithms of MUSIC and MVDR DOA Estimation

The Smart antenna systems plays an important role in wireless communications systems. This paper begins with a brief introduction about a smart antenna and majorly in this paper different type of DOA algorithms. Directio...

Effect of Social Media on Employee Productivity in Education Sector

Employees are considered as one of the most important assets of any institution. Success of an organisation depends on the productivity of its employees. The popularity of social media and their increasing use in the wor...

Intelligence Digital Energy Meter

Here a lot of customs are used electrical energy but not pay the bills in time.so here we avoid this problem by using this project. We can measure the power by each load and take the information through the mobile by usi...

Correlation between Business Process Management and Organizational Performance: A Study of Bank X

Business process management is multidimensional tool which utilizes several methods to examine processes from a holistic perspective, transcending the narrow borders of specific functions. It undertakes fundamental recon...

An in Depth Review Paper on Numerous Image Mosaicing Approaches and Techniques

Image mosaicing is one of the most important subjects of research in computer vision at current. Image mocaicing requires the integration of direct techniques and feature based techniques. Direct techniques are found to...

Download PDF file
  • EP ID EP505816
  • DOI 10.31033/ijemr.8.3.22
  • Views 113
  • Downloads 0

How To Cite

(2018). Risk Management in Construction Project. International Journal of Engineering and Management Research, 8(3), 162-167. https://europub.co.uk/articles/-A-505816