Safety Envelope Management Method for Marshaled Trains Based on Time Delay Protection
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 2
Abstract
[Objective] In flexible marshaled trains, the communication delay between the master railcar, subordinate railcar and ZC (zone controller) exhibits asynchrony, leading to potential issues such as overlapping, misalignment, and discontinuity in the safety envelopes of different trains. To enhance the accuracy of ZC in managing the safety envelopes of flexible marshaled trains, it is essential to study the message delay differences among different trains. It is aimed to dynamically manage the safety envelopes of marshaled trains under the premise of delay protection. [Method] A scenario analysis of the positional relationships among marshaled trains is conducted. A typical safety envelope handling solution for marshaled trains is introduced and the improved one is proposed, a comparative analysis between the two solutions is conducted. [Result & Conclusion] ZC and VOBC (vehicle on-board controller) calculate message delays with interactive delay calculation parameters. By comparing the delay status between the master and subordinate railcars, ZC dynamically calculates the safety envelope for marshaled trains. Unlike relying solely on the master railcar for extending the envelope, ZC can use the current position of the subordinate railcar for calculation when the master railcar position is uncertain, avoiding situations where adopting historical information causes delays in updating position reports promptly. The issue of low safety envelope accuracy when master railcar communication quality is poor, thereby enhancing the management precision of ZC controlled trains.
Authors and Affiliations
Peng GENG, Peng ZHAO, Yuwei NIE
Wind-Vehicle-Bridge Coupling Simulation Analysis of Flexible Hanger Arch Bridge in Suspended Monorail Transit
[Objective] Due to the characteristics of small structural stiffness and small width-span ratio of the track beam, the flexible hanger arch bridge in suspended monorail transit is vulnerable to wind loads, thus influen...
Application of Grouting Method for Underground Excavation Construction of Urban Rail Transit Connecting Passage in Water-rich Sandy Cobble Stratum
Objective Connecting Passage 1 in the interval of Jiujiang North Station and Longqiao Road Station of Chengdu Metro Line 19 Phase II is located in water-rich sandy cobble stratum. Limited by the location of the surroundi...
Practice of Defect Reconstruction in Embedded Rail Jointed Track on Large-span Steel Truss Bridge Ends
[Objective] To address the fractured joint bolt issues of embedded rail jointed tracks on large-span steel truss bridge ends, it is necessary to analyze the causes of the defects, design treatment plans, and explore re...
Research of Active Radial Device for Metro Train
Objective Metro trains experience wheel wear and noise issues when negotiating small radius curve section. Active radial technology for bogie wheelsets is considered an effective solution theoretically. It is essential t...
Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum
[Objective] To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive c...