Safety Envelope Management Method for Marshaled Trains Based on Time Delay Protection
Journal Title: Urban Mass Transit - Year 2024, Vol 27, Issue 2
Abstract
[Objective] In flexible marshaled trains, the communication delay between the master railcar, subordinate railcar and ZC (zone controller) exhibits asynchrony, leading to potential issues such as overlapping, misalignment, and discontinuity in the safety envelopes of different trains. To enhance the accuracy of ZC in managing the safety envelopes of flexible marshaled trains, it is essential to study the message delay differences among different trains. It is aimed to dynamically manage the safety envelopes of marshaled trains under the premise of delay protection. [Method] A scenario analysis of the positional relationships among marshaled trains is conducted. A typical safety envelope handling solution for marshaled trains is introduced and the improved one is proposed, a comparative analysis between the two solutions is conducted. [Result & Conclusion] ZC and VOBC (vehicle on-board controller) calculate message delays with interactive delay calculation parameters. By comparing the delay status between the master and subordinate railcars, ZC dynamically calculates the safety envelope for marshaled trains. Unlike relying solely on the master railcar for extending the envelope, ZC can use the current position of the subordinate railcar for calculation when the master railcar position is uncertain, avoiding situations where adopting historical information causes delays in updating position reports promptly. The issue of low safety envelope accuracy when master railcar communication quality is poor, thereby enhancing the management precision of ZC controlled trains.
Authors and Affiliations
Peng GENG, Peng ZHAO, Yuwei NIE
Impact of Small Clearance Bored Pile Construction under Rail Transit Bridges in Soft Soil Area
Objective The impact of small clearance construction between bored piles and piers of operational rail transit bridges in China′s coastal soft soil areas is becoming a bottleneck factor restricting urban rail transit pla...
Reflection from Zhengzhou ′7·20′ Rainstorm towards Personnel Evacuation Platform Renovation Design in Metro Sections
Objective In recent years, extreme weather events and natural disasters increase and intensify frequently, and rainstorm-induced disasters in built urban rail transit and on-going foundation pit projects are causing sign...
Prediction Model for Gravel Stratum Shield Cutter Wear and Parameter Sensitivity Analysis of Cutter Parameters
[Objective] The high volume fraction of quartz particles in gravel stratum can lead to significant wear of shield cutters, impacting construction progress and timelines. Establishing a prediction model for shield cutter...
Study on Delayed Lateral Displacement of Elastic Wheels in a Certain Type of Tram
Objective The delayed lateral displacement of elastic wheels occurs in a certain type of tram during servive, significantly affecting the safe operation and maintenance of the vehicle. Method Experimental research is con...
Simulation Analysis of A Metro Station Construction in Shenzhen with Small TBM Advancing Excavation Followed by Large TBM Enlargement
[Objective] The new technique of small-diameter TBM (tunnel boring machine) advancing excavations followed by large-diameter TBM enlargement is used for the first time in the construction of Tumor Hospital Station on She...