Safety Protection of Under-passing Existing Rail Transit Structures Based on Midas GTS Finite Element Software
Journal Title: Urban Mass Transit - Year 2025, Vol 28, Issue 3
Abstract
[Objective] With the rapid expansion of urban rail transit networks, the intersection of multiple lines has become a common phenomenon in urban construction. In particular, the increasing cases of newly constructed tunnels using the mining method under-passing existing rail transit structures necessitate in-depth research on the safety protection of these structures. [Method] Based on the safety protection project of a city′s Rail Transit Line 8 mining method tunnel under-passing existing Rail Transit Line 3, Midas GTS finite element software is used to simulate the impact of different external working conditions on the upper part existing rail transit structure. Through a detailed analysis of the deformation characteristics of the existing rail transit structure under various construction procedures, as well as a comparative analysis of numerical simulation results and the on-site monitoring data, the construction impact on above-mentioned existing structures is explored. [Result & Conclusion] Numerical simulation results show that when the new Metro Line 8 using mining method for the under-passing tunnel construction, the deformations of the existing rail transit structure remain within the control indicators. The maximum horizontal displacement of the main structure is 0.54 mm, and the maximum upward deflection of vertical displacement is 1.92 mm. On-site measured data indicate that the maximum horizontal displacement of the existing rail transit main structure is 0.50 mm, and the maximum vertical displacement is 1.60 mm. This shows that under reasonable parameter selection, numerical simulation, as a safety risk assessment tool, provides simulation results in good agreement with actual measurements. Additionally, numerical simulation can accurately predict the most adversely affected positions and the extent of structural impact, providing significant guidance for on-site construction and monitoring.
Authors and Affiliations
Zhangchuan GU
Simulation Research on Temperature Control of Metro Underground Substation Main Transformer Room
Objective Huge heat is generated during underground substation transformer operation. Failure to promptly dissipate this heat can lead to problems such as transformer overheating, equipment malfunctions, and even fire ac...
Prediction Method for Land Subsidence Induced by Foundation Pit Dewatering under Complex Conditions
[Objective] To study the land subsidence variation patterns induced by foundation pit dewatering under complex conditions, the deep foundation pit project at Nanjing Metro Line 5 Airport Road Station is taken as a case...
Subsidy Mechanism for Rail Transit Renewal and Renovation in Japan and the Enlightenment to China
[Objective] Drawing on the successful experiences of Japanese government in promoting the rail transit through subsidies can provide relevant cases of practical guiding significance for the establishment of an effectiv...
Study on the Vibration Influence Law of Bored Cast-in-place Pile Construction on Existing Strata and Pipe Trenches
[Objective] The rotary drilling process of bored cast-in-place piles will cause vibration to the existing underground buildings and structures. Therefore, it is necessary to study the vibration response of the strata a...
Mechanical Behavior of Urban Rail Transit Station Structure Based on Existing Shield Tunnel Interval Underground Excavation Construction
Objective Cancer Hospital Station on Shenzhen Rail Transit Line 14 adopts a scheme of large-diameter (8.5 m) shield tunnel expansion featuring tunnel-first and station-later. During the connection of the main station str...